Página 8
... concrete masonry . 1,129 cubic yards of brick masonry . The immediate charge of the construction of this work , is still confided to Mr. Geo . S. Greene , who has fulfilled his duties with great care and ability . The reservoir has been ...
... concrete masonry . 1,129 cubic yards of brick masonry . The immediate charge of the construction of this work , is still confided to Mr. Geo . S. Greene , who has fulfilled his duties with great care and ability . The reservoir has been ...
Página 9
... concrete has been so used as to prevent the possi- bility of any minute threads of water working through the seams of the rock , and coming in contact with the puddle . The material for the puddle has been obtained within the reservoir ...
... concrete has been so used as to prevent the possi- bility of any minute threads of water working through the seams of the rock , and coming in contact with the puddle . The material for the puddle has been obtained within the reservoir ...
Página 68
... concrete masonry . B. 1,343 cubic yards of brick masonry , in arches of more than five feet diameter , supported by centering . C. 2,800 cubic yards of all other brick masonry . D. 1,370 cubic yards of rubble range masonry . E. 2,575 ...
... concrete masonry . B. 1,343 cubic yards of brick masonry , in arches of more than five feet diameter , supported by centering . C. 2,800 cubic yards of all other brick masonry . D. 1,370 cubic yards of rubble range masonry . E. 2,575 ...
Página 70
... concrete masonry , and for all work to be measured and estimated as such , according to the specifications , and for all materials excepting as herein specified , and all labor therefor , to be measured in the work cents per cubic yard ...
... concrete masonry , and for all work to be measured and estimated as such , according to the specifications , and for all materials excepting as herein specified , and all labor therefor , to be measured in the work cents per cubic yard ...
Página 79
... concrete , after the pipes are laid . ( w ) There will be a waste way in the central bank adjacent to the gate - house , six feet wide , two feet deep below the top of the centre bank , with two sets of grooves for flush boards . ( x ) ...
... concrete , after the pipes are laid . ( w ) There will be a waste way in the central bank adjacent to the gate - house , six feet wide , two feet deep below the top of the centre bank , with two sets of grooves for flush boards . ( x ) ...
Otras ediciones - Ver todas
Annual Report of the Croton Aqueduct Department New York (City) Croton Aqueduct Board Vista completa - 1856 |
Términos y frases comunes
9 inches arches back bays basins and culverts Beekman Bleecker Bowery brick masonry Broadway Canal cents per cubic Coenties slip Common Council concrete contract contractor Croton Aqueduct Board Croton Aqueduct Department Croton Dam Croton river Croton water cubic feet cubic yards cut stone masonry dimension cut stone earth East river Eighth avenue Eleventh embankment engineer may direct excavation feet 6 inches feet 9 feet wide Fifth fore bays four feet Fourteenth Fourth avenue Fulton further agreed gate Greenwich half feet Houston Hudson hundred inches interior diameter labor therefor Lexington Lineal feet LOADS LOADS DATE materials and labor mortar Ninth north gate-house Number of sewers party pavement Pearl pieces pipe vaults reservoir Rivington rock SAND SCHEDULE Second avenue Seventh avenue six inches Sixth avenue specifications square street surface Tenth avenues Third avenue Thirty-ninth tion vitrified stone pipe walls Washington waste weirs West Wooster wrought iron York
Pasajes populares
Página 108 - Now, Therefore, the condition of the above obligation is such, that if the said shall well and truly, and in...
Página 76 - To prevent all disputes and litigation, it is further agreed by and between the parties to this contract that said engineer shall, in all cases, determine the amount or the quantity of the several kinds of work which are to be paid for under this contract...
Página 99 - Whenever the contractor is not present on any part of the work where it may be desired to give directions, orders will be given by the Engineer, and shall be received and obeyed by the superintendent or foreman who may have charge of the particular work in reference to which the orders are given.
Página 108 - ... bind ourselves, and each of our heirs, executors and administrators jointly and severally, firmly by these presents.
Página 108 - ... then this obligation to be void, or else to remain in full force and virtue of law.
Página 67 - ... no member of the common council head of department, chief of bureau, deputy thereof, or clerk therein, or other officer of the corporation, shall be directly or indirectly interested in any contract, work or business, or the sale...
Página 75 - ... of the first part, for the consideration hereinafter mentioned and contained, and under the penalty expressed in a bond bearing even date with these presents and...
Página 106 - Boston, for or on account of any injuries or damages received or sustained by any party or parties, by or from the said Contractor, his servants or agents...
Página 101 - If such alterations diminish the quantity of work to be done, they shall not constitute a claim for damages, or for anticipated profits on the work that may be dispensed with ; if they increase the amount of work, such increase shall be paid for according to the quantity actually done, and at the price established for such work under this contract...
Página 106 - 23. And the said party of the second part further agrees that he shall not be entitled to demand or receive payment for any portion of the aforesaid work or materials until the same shall be fully completed in the manner set forth in this agreement...