Standard Specifications for Construction of AirportsOffice of Airports, 1948 - 588 páginas |
Dentro del libro
Resultados 1-5 de 100
Página 14
... price bid for clearing and grubbing . All material found on the airport or ... paid for the removal of such material at the contract unit price for excavation , but ... payment will be made , the contractor shall remove from the site all ...
... price bid for clearing and grubbing . All material found on the airport or ... paid for the removal of such material at the contract unit price for excavation , but ... payment will be made , the contractor shall remove from the site all ...
Página 31
... payment bond given by the contractor becomes insolvent , or is placed in the hands of a receiver , or has its right ... price for the actual quantities of work done . No allowance will be made for anticipated profits . Increased or de- ...
... payment bond given by the contractor becomes insolvent , or is placed in the hands of a receiver , or has its right ... price for the actual quantities of work done . No allowance will be made for anticipated profits . Increased or de- ...
Página 32
... price , which will be agreed upon in writing before such work is begun for ... payment . Estimates will be made monthly or for such longer periods as ... payment , there will be deducted from the first estimate rendered after the ...
... price , which will be agreed upon in writing before such work is begun for ... payment . Estimates will be made monthly or for such longer periods as ... payment , there will be deducted from the first estimate rendered after the ...
Página 52
... price bid per acre or lump sum as specified in the bid schedule , which payment shall include full compensation for all equipment , tools , materials , labor , and incidentals necessary to complete the work . 151-4.2 The item of ...
... price bid per acre or lump sum as specified in the bid schedule , which payment shall include full compensation for all equipment , tools , materials , labor , and incidentals necessary to complete the work . 151-4.2 The item of ...
Página 55
... paid for at the contract unit price per cubic yard for " Unclassified Excavation " or for " Common Excavation " or ... Payment will not be made for removing and disposing of overbreak which the engineer determines to have been avoidable ...
... paid for at the contract unit price per cubic yard for " Unclassified Excavation " or for " Common Excavation " or ... Payment will not be made for removing and disposing of overbreak which the engineer determines to have been avoidable ...
Contenido
89 | |
108 | |
119 | |
131 | |
141 | |
148 | |
156 | |
162 | |
169 | |
176 | |
184 | |
197 | |
208 | |
216 | |
351 | |
369 | |
381 | |
397 | |
401 | |
412 | |
421 | |
435 | |
443 | |
455 | |
469 | |
544 | |
570 | |
578 | |
Otras ediciones - Ver todas
Términos y frases comunes
A. A. S. H. O. Method A. A. S. H. O. Specification airport amount applied approved areas asphalt cement backfill base course base material bituminous material cable coarse aggregate coat compacted concrete condition conform constitute full compensation contract unit price cubic foot cubic yard density depth duct engineer equipment excavation Federal Specification fence filler finished foot measurement furnishing and installing gradation grade inches incidentals necessary item shall consist joints layer lime liquid limit live seed measured mesh sieve mixer mixing mixture moisture mortar mulch necessary to complete operations paid paint pavement payment shall constitute percent pipe placed plans plant plasticity index Portland cement price and payment quantity removed requirements of A. A. S. H. O. roller rolling runway sample shown soil special provisions specific gravity spread square yard steel subbase subgrade surface temperature thickness tion topsoil trench underlying course uniform weight width windrow wire