Corps of Engineers. The plan contemplates the formation of a continuous channel 15 feet deep at mean low water from Jacksonville to the ocean. The points where work is required are in a reach near Dames Point, 12 miles from the mouth, and on the bar at... Annual Reports of the War Department - Página 175por United States. War Department - 1892Vista completa - Acerca de este libro
| United States. War Department. Corps of Engineers - 1889 - 954 páginas
...been carried on in conformity with a project submitted in 1S79 by the late General Gillmore, colonel Corps of Engineers. The plan contemplates the formation...low water from Jacksonville to the ocean. The points when; work is required are in a reach near Damn's Point, 12 miles from the month, and on the bar at... | |
| United States. War Department - 1889 - 954 páginas
...water from Jacksonville to the ocean. The points where work is required are in a reach near Dame's Point, 12 miles from the mouth, and on the bar at the mouth. Near Dame's Point the mean low-water depth varies from 9 to 10 feet. The bar at the mouth is formed of sand.... | |
| United States. Army. Corps of Engineers - 1889 - 954 páginas
...water from Jacksonville to the ocean. The points where work is required are in a reach near Dame's Point, 12 miles from the mouth, and on the bar at the mouth. Near Dame's Point the mean low-water depth varies from 9 to 10 feet. The bar at the mouth is formed of sand.... | |
| United States. War Department - 1890 - 1128 páginas
...been carried on in conformity with a project submitted in 187!) by the late General Gillmore, Colonel Corps of Engineers. The plan contemplates the formation...points where work is required are in a reach near Dame's Point, 12 miles from the mouth, and on the bar at theinouth. Near Dame's Point the mean low-water... | |
| 1890 - 998 páginas
...been carried on in conformity with a project submitted in 1879 by the late General Gillmore, colonel Corps of Engineers. The plan contemplates the formation...points where work is required are in a reach near Dame's Point, 12 miles from the mouth, and on the bar at the mouth. Near Dame's Point the mean low-water... | |
| United States. War Department - 1890 - 1130 páginas
...been carried on in conformity with a project submitted iu 1870 by the late General Gillinore, Colonel Corps of Engineers. The plan contemplates the formation...points where work is required are in a reach near Dame's Point, 12 miles from the mouth, and on the bar at the month. Xear Dame's Point the mean low-water... | |
| United States. Army. Corps of Engineers - 1894 - 904 páginas
...have been carried on in conformity with a project submitted in 1879, by the lato Col. QA Gillmore, Corps of Engineers. The plan contemplates the formation of a continuous channel, l."i feet deep at mean low water, from Jacksonville to the ocean. The points where work is required... | |
| United States. War Department - 1903 - 1162 páginas
...4.5 feet at the mouth to 1 foot at Jacksonville. The first project, adopted in 1879, contemplated a channel 15 feet deep at mean low water from Jacksonville to the ocean, a distance of about 27.5 miles. This was to be obtained by dredging and building training walls in... | |
| United States. Committee on commerce - 1910 - 798 páginas
...Point, and 0.8 foot at Jacksonville. The first project of improvement, adopted in 1879, contemplated a channel 15 feet deep at mean low water from Jacksonville to the ocean. This was to be obtained by dredging and building training walls in the river and by building two stone... | |
| |