United States Congressional Serial SetU.S. Government Printing Office, 1912 Reports, Documents, and Journals of the U.S. Senate and House of Representatives. |
Dentro del libro
Resultados 1-5 de 61
Página 16
... contractors , the commissioners recommended to Congress last year , and have also recommended in their estimates for the ... contractor's leasing the disposal plants from the District of Columbia . The com- missioners earnestly urge the ...
... contractors , the commissioners recommended to Congress last year , and have also recommended in their estimates for the ... contractor's leasing the disposal plants from the District of Columbia . The com- missioners earnestly urge the ...
Página 64
... contractor , located about 32 miles from Washington , and the garbage is there disposed of by the reduction process . Ashes . The collection and disposal of ashes within the existing fire limits of the District of Columbia and certain ...
... contractor , located about 32 miles from Washington , and the garbage is there disposed of by the reduction process . Ashes . The collection and disposal of ashes within the existing fire limits of the District of Columbia and certain ...
Página 65
... contractor located about 4 miles from the city . Night soil . The collection and disposal of night soil from all privies , except such as are established by contractors on construction work , and from all streets , avenues , alleys ...
... contractor located about 4 miles from the city . Night soil . The collection and disposal of night soil from all privies , except such as are established by contractors on construction work , and from all streets , avenues , alleys ...
Página 67
... contractor at the rate of 224 cents per 1,000 square yards for all of the territory swept by this gang . No more machine sweeping , however , is required to gather the leaves than in ordinary times and the extra weight is not ...
... contractor at the rate of 224 cents per 1,000 square yards for all of the territory swept by this gang . No more machine sweeping , however , is required to gather the leaves than in ordinary times and the extra weight is not ...
Página 68
... contractors , the commissioners recommended to Congress that an appropriation of $ 10,000 be made for the purpose of investigating and reporting on the collection and disposal of city waste , including the preparation of plans and ...
... contractors , the commissioners recommended to Congress that an appropriation of $ 10,000 be made for the purpose of investigating and reporting on the collection and disposal of city waste , including the preparation of plans and ...
Otras ediciones - Ver todas
Términos y frases comunes
14th St alley amount Anacostia River appropriation asphalt asphalt block asphalt cement basins Bidders brick Bridge Capitol Carpentering cents per square completed concrete base Congress Heights construction contract contractor cost cubic feet cubic yard curb District of Columbia division drawn by janitor East side electric ended June 30 engine house engineer commissioner excavation expenses fiscal year ended gallons Gas engine Georgia Avenue grade gravel hauling Heating inches inspection INSPECTOR OF BUILDINGS installed July June 30 Labor laid lamps linear feet Location macadam Manual Training School Massachusetts Avenue Material drawn meters miles Miscellaneous necessary night soil North side Observatory Circle Painting Park pavement paving Place Plumbing Potomac Proposals removed repairs Rhode Island Avenue Road Rock Creek sand sewers specifications square yard stone street cleaning Street NW subdivision superintendent surface tests Tinning tion total number valves vitrified Washington water mains Western High School Wisconsin Avenue
Pasajes populares
Página 324 - No laborer or mechanic doing any part of the work contemplated by this contract, in the employ of the Contractor or any subcontractor contracting for any part of said work contemplated, shall be required or permitted to work more than eight hours in any one calendar day...
Página 324 - ... in which he shall be required or permitted to labor more than eight hours upon said work...
Página 324 - Territory, and in the case of a contract made by the District of Columbia to the Commissioners thereof, who shall have power to review the action imposing the penalty, and in all such appeals from such final order whereby a contractor or subcontractor may be aggrieved by the imposition of the penalty hereinbefore provided such contractor or subcontractor may within six months after decision by such head of a department or the Commissioners of the District of Columbia file a claim in the Court of...
Página 78 - have the honor to submit the following report of the operations of this office during the fiscal year ending June 30, 1912, summarized in the following tables: Total number of samples tested.
Página 324 - Any contractor or sub-contractor aggrieved by the withholding of any penalty as hereinbefore provided shall have the right within six months thereafter to appeal to the head of the department making the contract on behalf of the United States or the territory, and In the case of a contract made by the District of Columbia to the commissioners thereof, who shall have power to review the action Imposing the penalty, and In all such appeals from such final order whereby...
Página 76 - ... payment to all persons supplying him with labor or material in the prosecution of the work provided for in the contract.
Página 323 - All loss or damage arising out of the nature of the work to be done under this agreement, or from any unforeseen obstructions or difficulties which may be encountered in the prosecution of the same, or from the action of the elements, or from incumbrances on the line of the work, shall be sustained by the said Contractor.
Página 76 - ... any improper materials used in its construction, or by or on account of any act or omission of the said contractor or his agents...
Página 314 - Engineer, and for this he shall be paid at current contract rates for work of a similar character, or if the extra work should be of a class for which no rate is fixed by current contracts, the actual reasonable cost to the contractor, as determined by the Engineer, plus 15 per cent of said cost. The contractor shall have no claim for compensation for extra work unless the same is ordered in writing by the Engineer.
Página 310 - It is further expressly understood and agreed that if any of the pavements laid should, for any reason whatsoever, within the period of five years, prove inferior to the best laid in the District prior to July 1, 1904, then the contractor shall, on demand of the Commissioners, remove such defective pavements and relay them with new material of approved quality, and in accordance with these specifications. The Engineer Commissioner shall decide the question of inferiority.