ContractBoard of Water Supply, 1915 |
Dentro del libro
Resultados 1-5 de 100
Página 68
... bolts extending through the stones . Ends of anchors shall be cast in the concrete - stones or shall be cemented into holes drilled or cast in the concrete - stones . Dowels shall be used wherever directed . Anchors and dowels shall be ...
... bolts extending through the stones . Ends of anchors shall be cast in the concrete - stones or shall be cemented into holes drilled or cast in the concrete - stones . Dowels shall be used wherever directed . Anchors and dowels shall be ...
Página 74
... bolts . Tie - rods shall be placed as indicated . Crane girders shall be anchored with 1 - inch bolts of suitable length , placed wherever directed . Shop drawings showing details of all steelwork shall be submitted for approval before ...
... bolts . Tie - rods shall be placed as indicated . Crane girders shall be anchored with 1 - inch bolts of suitable length , placed wherever directed . Shop drawings showing details of all steelwork shall be submitted for approval before ...
Página 75
... bolts at top and bottom , securely fastened to the door . Rim locks will be provided by The City , but the Contractor Locks . shall do all cutting , riveting and bolting to fit same in working order . Locks shall be removed after ...
... bolts at top and bottom , securely fastened to the door . Rim locks will be provided by The City , but the Contractor Locks . shall do all cutting , riveting and bolting to fit same in working order . Locks shall be removed after ...
Página 77
... bolts devices . or screw anchors . operating device . SECT . C. 3 Sections of the sashes designated on the draw- Ventilation ; pivoted sash ; ings shall be hinged or pivoted . These sections shall be double- operating weathered on all ...
... bolts devices . or screw anchors . operating device . SECT . C. 3 Sections of the sashes designated on the draw- Ventilation ; pivoted sash ; ings shall be hinged or pivoted . These sections shall be double- operating weathered on all ...
Página 86
... bolts , screws and necessary metal - work . HEATING DOWNTAKE CHAMBER SECT . E. 1 The low - pressure steam return heating system shall be used , of the best materials and workmanship and sufficient capacity to raise the temperature of ...
... bolts , screws and necessary metal - work . HEATING DOWNTAKE CHAMBER SECT . E. 1 The low - pressure steam return heating system shall be used , of the best materials and workmanship and sufficient capacity to raise the temperature of ...
Otras ediciones - Ver todas
Términos y frases comunes
acceptance amount approved Ashokan reservoir B&S gage Base Plug Receptacle Board of Water bolts brazing brick bronze building Catskill aqueduct cent Center line Certificate of acknowledg Chapter 724 Chief Eng Chief Engineer CITY TUNNEL complete concrete concrete-stone Condulets Contractor copper corporate seal County crane Croton Lake damages delivered Dept Eng Hdqrs dollars Drainage chamber estimate executed the foregoing File Cont foregoing instrument Galvanized Steel gate-valves grout Hill View inch installed Item Junction Box Kensico Kensico dam known and known labor lamp Laws lighting liquidated damages lump sum materials moneys necessary paid payment performance personally known pipe plates price stipulated Purlin quantities roof sash SECT SECTION A-A Shaft SHEETS IN SET Silver Lake Snap Switch specifications stone substructure surety surface therein thereof thereto tractor TRUSS valve Volt WATER SUPPLY CATSKILL Westchester county White Portland cement York BOARD York City
Pasajes populares
Página 29 - ... no laborer, workman or mechanic in the employ of the contractor, sub-contractor or other person doing or contracting to do the whole or a part of the work contemplated by the contract shall be permitted or required to work more than eight hours in any one calendar day, except in cases of extraordinary emergency caused by fire, flood or danger to life or property.
Página 39 - Each contract for such public work hereafter made shall contain a provision that the same shall be void and of no effect unless the person or corporation making or performing the same shall comply with the provisions of this...
Página 33 - ... in all cases decide every question which may arise relative to the fulfillment of this contract on the part of the Contractor.
Página 40 - Now, Therefore, the condition of the above obligation is such, that if the said shall well and truly, and in a good, sufficient and workmanlike manner, perform the...
Página 4 - On this day of , 10 — , before me personally came to me known and known to me to be the same person described in and who executed the foregoing instrument, and be acknowledged to me that he executed the same for the purposes therein mentioned.
Página 72 - ... orders will be given by the Engineer, and shall be received and obeyed by the superintendent or foreman who may have charge of the particular work in reference to which the orders are given.
Página 71 - Wherever in the specifications or upon the drawings the words directed, required, ordered, designated, prescribed, or words of like import are used, it shall be understood that the direction, requirement, order, designation, or prescription, of the Contracting Officer is intended and similarly the words approved, acceptable, satisfactory...
Página 33 - Is intended and similarly the words approved, acceptable, satisfactory, or words of like import shall mean approved by, or acceptable to, or satisfactory to the Contracting Officer, unless otherwise expressly stated.
Página 62 - Contractor, and in case any question shall arise between the parties hereto, touching this contract, such estimate and decision shall be a condition precedent to the right of the Contractor to receive any money under this contract.