Annual Report1894 |
Dentro del libro
Resultados 1-5 de 73
Página 5
... removal of these boulders . The work under the contract with the Eastern Dredging Company for filling about 200,000 cubic yards at the north- east corner of the seventy - five - acre lot dated July 1 , 1892 , and extended to January 1 ...
... removal of these boulders . The work under the contract with the Eastern Dredging Company for filling about 200,000 cubic yards at the north- east corner of the seventy - five - acre lot dated July 1 , 1892 , and extended to January 1 ...
Página 8
... removal of gravel under permits given to the owner of the beach . So far as appears at present , the removal of the gravel from the proper places and in a proper manner does not injure the beach . In June , July and August , a survey ...
... removal of gravel under permits given to the owner of the beach . So far as appears at present , the removal of the gravel from the proper places and in a proper manner does not injure the beach . In June , July and August , a survey ...
Página 9
... removal of certain shoals which now prevent the larger vessels from reaching the wharves . In September surveys were made to determine the amount of filling which had been done by certain persons and cor- porations in South Bay , along ...
... removal of certain shoals which now prevent the larger vessels from reaching the wharves . In September surveys were made to determine the amount of filling which had been done by certain persons and cor- porations in South Bay , along ...
Página 11
... removal of the piles and the rebuilding of its bridges with stone piers more costly than it otherwise would have been . The fact that the corporation has chosen to make a large expenditure on a temporary structure , should not at any ...
... removal of the piles and the rebuilding of its bridges with stone piers more costly than it otherwise would have been . The fact that the corporation has chosen to make a large expenditure on a temporary structure , should not at any ...
Página 14
... removed or changed by the city so as to leave a clear opening of 40 feet in the draw - way whenever such removal or change shall be ordered by the Board after hearing . The Old Colony Railroad bridge is below the Dover Street Bridge ...
... removed or changed by the city so as to leave a clear opening of 40 feet in the draw - way whenever such removal or change shall be ordered by the Board after hearing . The Old Colony Railroad bridge is below the Dover Street Bridge ...
Otras ediciones - Ver todas
Términos y frases comunes
Acts aforesaid Board of Harbor Boston & Maine Boston harbor build a pile bulkhead caused these presents Charles River Chelsea Creek city of Boston COMMONWEALTH OF MASSACHUSETTS Company for license completed Congress Street Connecticut River contract cubic yards deep at mean East Boston Eastern Dredging Company excavated feet wide fill solid Fort Point Channel Granted April Granted July Granted June Granted Oct Granted Sept Harbor and Land Hull Bay improvement jetty Land Commissioners license to build license to fill license to widen Maine Railroad Mashpee material mean low water Mystic River Neponset River party Petition pier pile wharf planting Point Channel Pond portion Province Lands Provincetown Provincetown harbor Railroad Company removal of wrecks removed by dredging Reserved Channel riprap sand schooner sea wall SEAL shoal South Boston Flats Street bridge survey Taunton River thereof tidal tide water tion tons gross tonnage town vessels Weymouth Fore River wharves
Pasajes populares
Página 21 - Statutes in regard to fish-weirs should be so amended that licenses for fish-weirs granted by the mayor and aldermen of a city or the selectmen of a town may...
Página 15 - An Act making appropriations for the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes...
Página 70 - PARTY OF THE SECOND PART. The said party of the second part, hereby covenants and agrees with the said party of the first part...
Página 78 - States for examination of the offense alleged against him, and such commissioner, judge, or court shall proceed in respect thereto as authorized by law in cases of crimes against the United States.
Página 79 - That the placing, discharging, or depositing, by any process or in any manner, of refuse, dirt, ashes, cinders, mud, sand, dredgings, sludge, acid, or any other matter of any kind other than that flowing from streets, sewers, and passing therefrom in a liquid state...
Página 78 - Every such person who shall wilfully fail or refuse to open, or cause to be opened, the draw of any such bridge for the passage of a boat or boats, or who shall unreasonably delay the opening of said draw after reasonable signal shall have been given, as provided in such regulations, shall be deemed guilty of a misdemeanor...
Página 80 - War grants to any person or persons permission to extend piers, wharves, bulkheads, or other works, or to make deposits in any tidal harbor or river of the United States beyond any harbor lines established under authority of the United States, he shall cause to be ascertained the amount of...
Página 47 - June 14, 1880, provides for the widening and deepening of the river so as to secure a channel of at least 12 feet depth at high water, with 100 feet width from its mouth up to Berkley Bridge (above Dighton); thence 12 feet depth with 80 feet width (100 feet width at bends) up to Briggs shoal; thence 11 feet depth with 80 feet width up to the "shipyard...
Página 79 - And any and every master, pilot, and engineer, or person or persons acting in such capacity, respectively, on board of any boat or vessel who shall knowingly engage in towing any scow, boat, or vessel loaded with any material specified in section thirteen of this Act to any point or place of deposit or discharge...
Página 51 - WORK REQUIRED TO COMPLETE THE EXISTING PROJECT. • The work required to complete the existing project is the excavation of the remaining half of the Middle Ground to a depth of 10 feet at mean low water.