Plimt construction: $22, 042.02 $11, 190. 85 $33, 232. 87 361. 67 210.64 572. 31 Set of storage tracks and switch track extension. 1, 853. 19 1, 569. 83 3, 423.02 Twenty-horse capstans. 413. 89 37.45 451.34 Miscellaneous 8,975. 95 2, 991. 25 11, 967. 20 Steam and water pipe fittings and plumbing fixtures, etc.... 688,48 $50, 335.22 Repairs to plant: Lengthening steamer Doris .. 1,012. 78 194. 40 1, 207.18 Tower leads 894. 66 73. 05 967. 71 Repairs to hydraulic grader No. 5 674.82 65. 83 740, 65 Repairs to launching ways and storage tracks. 660. 61 101, 12 761. 73 Repairs to skifts. 237. 11 61.97 299, 08 Changing grader No. 8 to steam hammer driver 317.07 166. 38 483. 45 Repairs to pilo sinker 3, 361. 05 1, 037.01 4, 398. 06 Miscellaneous 4, 183.98 429.06 4, 613. 04 Spring of 1894 repairs 758. 29 56. 53 814. 82 Tiller rope and chain 20. 26 Steam heater 135 78 Engine frame, capstan gear, and other castings. 113. 46 New chimneys and stovepipe 109.00 Steam hose 129.50 14,856.72 Care of plant: Pulling out fleet, winter of 1893 3, 493. 61 235. 21 3, 728. 82 Launching fleet, spring of 1894 552, 31 15. 15 567. 46 General care of plant.. 11. 363. 65 651. 09 12, 014. 74 Raising and pulling out sunken grader No. 8. 510. 23 23. 44 533. 67 Rope 791. 47 Coal oil, soap, matches, gasoline, and other supplies 421.40 18, 060. 56 New plant purchased: Stoves, ranges, brooms, brushes, mess utensils, lamps, crockery, clocks, office furniture, quarter: 1, 484. 86 Oars, lanterns, oilers, wrenches, augers, platform scale, brush hooks, files, shovels, differential blocks, 331. 99 Babcock fire-extinguisher... 38.50 1, 855.35 Administration 3, 256.18 Office and incidental expenses. 4, 637. 10 Steamboat service 8,885. 22 16, 778.50 Tota: 101, 886. 35 The value of plant and material on hand amounts to $9,307.40. SURVEYS. The periodical sounding of cross sections on the established ranges of the reach ander improvement was kept up till tield operations were suspended in the fall, about which time, on account of want of funds, the regular survey party was disbanded and only a few of the sections occasionally sounded. The total number of sections sounded amounted to 588. Other work carried on by the survey party consisted of making a survey of the reach between the head of Stanley Island and Portland in September and October, making 19 discharge measurements and giving lines and elevations for dike construction. All the field notes have been platted and areas of sections computed and tabulated. The total cost of surveys, including mapping, tracing, etc., amounts to $5,645.89. Very respectfully, your obedient servant, SAM’L H. YONGE, Division Engineer. Lieut. Col. CHAS. R. SUTER, Corps of Engineers, U. S. A., President Missouri River Commission. |