Sinking

casing and core drilling.

Removal of casing.

Measurement.

Payment.

SECT. 4.2 If the character of the rock to be drilled is such that casing is required to safely drill the hole to the required depth, the Contractor shall continue to drive casing to such depth as may be required. The diameter of the casing used shall not be reduced below that which will give 13-inch core, without permission.

SECT. 4.3 After the drilling of any hole has been completed the Contractor shall refill the hole with satisfactory material from the test-pits and shall remove the casing, if any.

SECT. 4.4 Each core boring shall be measured for payment from the surface of the sound rock as determined by the wash boring to the bottom of the drilled hole.

SECT. 4.5 Under Item 4 payment shall be made at the price stipulated for the number of linear feet of core borings measured in the manner stipulated. This payment shall include all labor and material necessary to furnish, set up and operate the drilling machines; to carry the casings to the required depth; to drill the rock; to obtain, preserve, mark, box and deliver the cores; to refill the hole after completion of drilling; to remove the casing; to take down and remove machines; to move machines to new locations, and to clean up premises occupied by said machines. The cost of all water used and appliances for procuring the same shall be included in the price stipulated under Item 4.

Description.

LAKE BORINGS

Item 5

SECT. 5.1 Where directed, the Contractor shall make borings to determine the character of the material underlying Silver lake. He shall support the boring apparatus on a suitable raft, scow or platform. The method of operation shall be similar to that specified for land borings and if bed-rock is encountered, core borings shall be made if so ordered.

SECT. 5.2 Measurement for payment shall be made from Measurement. the surface of the water to the lowest point reached by the casing or drill.

SECT. 5.3 Under Item 5 payment shall be made for the Payment. actual number of linear feet of lake borings measured in the manner specified, and shall include all apparatus, labor and materials necessary to make the borings as herein specified, and for the removal of all machinery, tools, lumber or supports from the site of the work.

DYNAMITE

Item 6

SECT. 6.1 Blasting necessary to assist in the sinking of Blasting. casings or test-pits shall be done by the Contractor. He shall furnish all necessary dynamite of suitable quality, batteries, wiring and other apparatus. He shall observe the provisions of Article XVIII hereof, and shall cover or otherwise satisfactorily protect the blasts.

SECT. 6.2 Under Item 6 payment shall be made for the Payment. number of pounds of dynamite used as directed.

CASING LEFT IN PLACE

Item 7

SECT. 7.1 The Contractor shall not remove any casing Description. ordered left in place. It is expected that not more than two sizes of casing will be ordered left in place at any hole, and the Contractor shall remove the outer lines of casing, using care not to disturb those lines which are ordered left in place.

SECT. 7.2 The weight of casing to be paid for shall be Measurement, determined by taking the total length of casing ordered left in

place and multiplying this length by the "nominal weight" per

Payment.

foot of the casing. Where casing of thickness other than standard is used, the weight will be determined by computing the amount of steel or iron per foot of casing, allowing 490 pounds as the weight per cubic foot. No allowance shall be made for couplings or other fittings that may be required for the pipe.

SECT. 7.3 Under Item 7 payment will be made for the number of pounds of casing ordered left in place, measured in the manner specified. This payment shall include all labor and material necessary to protect the pipe while removing other casing, and to cut, thread and cap the pipe at the level ordered.

[blocks in formation]

Acceptance of work or extension of time not a waiver..

Access to work ...

Accidents, prevention of, and indemnification for......
Acknowledgement, certificate of:

of Board

of Contractor to contract...

of surety..

Additional time for performance.
Additional work and materials...
Address:

and name of Bidder...

and name of surety.

PAGE

26

25

5

33

21

25

36

37,38

14

20

21

6

12

[blocks in formation]

Amount to be expended, certificate of Board as to.....

[blocks in formation]

Bidder's:

ability

affidavit

declaration

experience, statement of.

name and address..

signatures

Bidders:

intending, to examine sites.

must satisfy themselves as to accuracy of approxi

mate quantities

referred to laws.

Bidding, balanced

Bids:

basis for comparing.

date for opening.

form for, printed..
in formal

may be rejected.

Board, defined ...

Board, signatures of, to contract..

Bond:

for performance of contract.

required....

time for executing contract and..

to indemnify municipalities against paupers, etc..

Certificate:

as to amount to be expended..

final estimate and, and final payment.

of acknowledgment of Board...

of acknowledgment of Contractor.

of acknowledgment of surety.

of award of contract....

of Contractor as to parties interested..

Certified check ....

Change of quantity, prices not changed by.
Changed, address of Contractor may be...
Check, certified

Checks returned

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]