Página 9
... river front between Thirteenth and Fourteenth Streets SW . The appropriation was not made , but in lieu thereof the sum of $ 5,000 was appropriated to enable the commissioners to make a thorough investigation of the desirability and ...
... river front between Thirteenth and Fourteenth Streets SW . The appropriation was not made , but in lieu thereof the sum of $ 5,000 was appropriated to enable the commissioners to make a thorough investigation of the desirability and ...
Página 24
... river and affording magnificent views of the city and surrounding territory . The Piney Branch Valley Park includes the valley of Piney Branch , between Sixteenth Street and Georgia Avenue . This is well adapted for park purposes , as ...
... river and affording magnificent views of the city and surrounding territory . The Piney Branch Valley Park includes the valley of Piney Branch , between Sixteenth Street and Georgia Avenue . This is well adapted for park purposes , as ...
Página 26
... on Kennedy Street , from Fourteenth Street to and into the park , should be provided by proper legislation . ANACOSTIA RIVER AND FLATS . In the District appropriation act 26 OPERATIONS OF THE ENGINEER DEPARTMENT , D. C..
... on Kennedy Street , from Fourteenth Street to and into the park , should be provided by proper legislation . ANACOSTIA RIVER AND FLATS . In the District appropriation act 26 OPERATIONS OF THE ENGINEER DEPARTMENT , D. C..
Página 27
... River , the commissioners believe it will be necessary to acquire by condemnation all water frontage on each side of the Anacostia River , between the high - water line and the 10 - foot - contour line , and also the title to any land ...
... River , the commissioners believe it will be necessary to acquire by condemnation all water frontage on each side of the Anacostia River , between the high - water line and the 10 - foot - contour line , and also the title to any land ...
Página 28
... river leased for commercial purposes . The wharves along the Georgetown Channel of the river are private property except at the foot of streets . A lease has been entered into for the foot of Thirty - third Street , and for the foot of ...
... river leased for commercial purposes . The wharves along the Georgetown Channel of the river are private property except at the foot of streets . A lease has been entered into for the foot of Thirty - third Street , and for the foot of ...
Otras ediciones - Ver todas
Términos y frases comunes
14th St alley amount Anacostia River appropriation asphalt asphalt block asphalt cement basins Bidders brick Bridge Capitol Carpentering cents per square completed concrete base Congress Heights construction contract contractor cost cubic feet cubic yard curb District of Columbia division drawn by janitor East side electric ended June 30 engine house engineer commissioner excavation expenses fiscal year ended gallons Gas engine Georgia Avenue grade gravel hauling Heating inches inspection INSPECTOR OF BUILDINGS installed July June 30 K Street Labor laid lamps leaks linear feet Location macadam Manual Training School Massachusetts Avenue Material drawn meters miles Miscellaneous night soil Painting Park pavement paving Plumbing Potomac Proposals removed repairs Rhode Island Avenue Road Rock Creek sand sewers specifications square yard stone street cleaning Street NW subdivision superintendent surface tests Tinning tion total number valves vitrified Washington water department water mains Western High School Wisconsin Avenue
Pasajes populares
Página 322 - District, which may require or involve the employment of laborers or mechanics shall contain a provision that no laborer or mechanic doing any part of the work contemplated by the contract in the employ of the contractor or any subcontractor contracting for any part of said work contemplated shall be required or permitted to work more than eight hours in any one calendar day...
Página 322 - ... in which he shall be required or permitted to labor more than eight hours upon said work...
Página 319 - All loss or damage arising out of the nature of the work to be done under this agreement, or from any unforeseen...
Página 322 - Territory, and in the case of a contract made by the District of Columbia to the Commissioners thereof, who shall have power to review the action imposing the penalty, and in all such appeals from such final order whereby a contractor or subcontractor may be aggrieved by the imposition of the penalty hereinbefore provided such contractor or subcontractor may within six months after decision by such head of a department or the Commissioners of the District of Columbia file a claim in the Court of...
Página 322 - Any contractor or sub-contractor aggrieved by the withholding of any penalty as hereinbefore provided shall have the right within six months thereafter to appeal to the head of the department making the contract on behalf of the United States or the territory, and In the case of a contract made by the District of Columbia to the commissioners thereof, who shall have power to review the action Imposing the penalty, and In all such appeals from such final order whereby...
Página 80 - The penalty of this bond will be equal to the specified or estimated annual amount of the contract, and if the estimated annual amount of the contract is less than 25...
Página 80 - ... any improper materials used in its construction, or by or on account of any act or omission of the said contractor or his agents...
Página 320 - If, in any event, the party of the second part shall delay or fail to commence with the delivery of the material or the performance of the work on the day specified herein, or shall, in the judgment of the Engineer in charge, fail to prosecute faithfully and diligently the 234 US Opinion of the Court.
Página 305 - The surface will then be compressed by steam rollers, after which a small amount of hydraulic cement will be swept over it, and it will then be thoroughly compressed by a steam roller weighing not less than 175 pounds to the inch run, the rolling being continued for not less than five hours for every 1,000 yards of surface.
Página 289 - When the asphalt cement contains over 5 per cent of material that will separate by subsidence while in a molten condition it must be thoroughly agitated before drawing from storage and while in use in the supply kettles so as to insure a uniform cement. These properties shall be determined by tests made by uniform methods, descriptions of which are on file in the office of the engineer commissioner.