Technical Reports, Volúmenes5-7The District, 1917 |
Dentro del libro
Resultados 1-5 de 100
Página 5
... concrete ; that the river channel improvements will involve the excavation of nearly 5,000,000 cubic yards ; and that the whole pro- ject will cost about $ 25,000,000 . In order to plan the project intelligently , many thorough 5.
... concrete ; that the river channel improvements will involve the excavation of nearly 5,000,000 cubic yards ; and that the whole pro- ject will cost about $ 25,000,000 . In order to plan the project intelligently , many thorough 5.
Página 10
... Excavation - classification 114 0.66 Excavation - work to be done 115 0.67 Excavation - limits of ...... .115 0.68 Excavation - cleaning surface for inspection 116 0.69 Excavation - use of explosives .. .116 0.70 Excavation - finishing ...
... Excavation - classification 114 0.66 Excavation - work to be done 115 0.67 Excavation - limits of ...... .115 0.68 Excavation - cleaning surface for inspection 116 0.69 Excavation - use of explosives .. .116 0.70 Excavation - finishing ...
Página 11
... Excavation , soil stripping Fage 133 135 ** 136 137 6 , 7 , 8 , 6a , 7a , and 8a Excavation for new channels in channel im- provements , for cutoff trenches and for stream channels ........ 138 9 , 10 , and 11 Excavation for river ...
... Excavation , soil stripping Fage 133 135 ** 136 137 6 , 7 , 8 , 6a , 7a , and 8a Excavation for new channels in channel im- provements , for cutoff trenches and for stream channels ........ 138 9 , 10 , and 11 Excavation for river ...
Página 16
... excavations through no fault of the contractor , he shall be paid for their removal . Similarly , the contractor is ... excavation ; and 0.85 to 0.105 , Relating to concrete . USE OF FORMS AND SPECIFICATIONS For each of the important 16 ...
... excavations through no fault of the contractor , he shall be paid for their removal . Similarly , the contractor is ... excavation ; and 0.85 to 0.105 , Relating to concrete . USE OF FORMS AND SPECIFICATIONS For each of the important 16 ...
Página 18
... Excavation , 200,000 cu . yds .; embankment , 850,000 cu . yds .; concrete , 20,000 cu . yds .; paving and riprap , 1,000 cu . yds .; iron and steel , 120 tons . Contract No. 2. - Englewood Dam and appurtenances , including Road No. 3 ...
... Excavation , 200,000 cu . yds .; embankment , 850,000 cu . yds .; concrete , 20,000 cu . yds .; paving and riprap , 1,000 cu . yds .; iron and steel , 120 tons . Contract No. 2. - Englewood Dam and appurtenances , including Road No. 3 ...
Contenido
214 | |
217 | |
223 | |
226 | |
230 | |
235 | |
241 | |
248 | |
60 | |
66 | |
77 | |
80 | |
100 | |
106 | |
112 | |
113 | |
116 | |
129 | |
181 | |
202 | |
204 | |
208 | |
267 | |
273 | |
13 | |
20 | |
26 | |
33 | |
37 | |
67 | |
73 | |
81 | |
87 | |
126 | |
8 | |
13 | |
Términos y frases comunes
24-hour rainfall amount annual rainfall Area in Square bbls borrow pits cast iron Cement cent channel Clearing and grubbing concrete construction Contract Contractor culverts D Max damage dams days A Max Dayton Depth in Inches drainage Drawings dressing and grassing Elbe embankment Engineer excessive precipitation figures Furnishing vitrified pipe gravel Greatest Average Depth inches fell iron pipe isohyetal Isohyetal-Inches isopluvial charts item shall include July 15 June low pressure areas MAP FOR MAXIMUM March material Maximum Rainfall Rainfall mean annual mean low water method Miami Conservancy District Miami River Miami Valley occurred Ohio paving payment Period of Maximum pluvial index quadrangle rainfall records rains Reinforcing steel retarding basin Riprap River runoff second feet Section Sept sheet piling shown shows slopes Specifications spillway Square Miles stations Storm Area Storm of July Surety Surface dressing temperature time-area-depth curves tion Total Storm unit price
Pasajes populares
Página 103 - Board may notify the Contractor to discontinue all work or any part thereof, under this Contract, by a written notice to be served upon the Contractor...
Página 78 - Obligation is such that if the Principal shall faithfully perform the Contract on his part, and...
Página 102 - If the Contractor shall, without such previous written consent, assign, transfer, convey, sublet, or otherwise dispose of this contract, or of his right, title or interest therein, or any of the moneys to become due under...
Página 104 - ... under and by virtue of this agreement or any part thereof, and in case such expense is less than the sum which would have been payable under this contract, if the same had been completed by said contractor, then the said party of the second part shall be entitled to receive the difference...
Página 99 - Contractor shall employ only competent. employed. skillful men to do the work, and whenever the Engineer shall notify the Contractor, in writing, that any man on the work is, in his opinion, incompetent, unfaithful, disorderly or otherwise unsatisfactory, such man shall be discharged from the work, and shall not again be employed on it, except with the consent of the Engineer. wuTufbor ART- XVII. The Contractor shall comply with the proviriquired sions of Chapter 415, of the Laws of 1897, as amended,...
Página 103 - ... if at any time the Engineer shall be of the opinion and shall so certify in writing to the...
Página 91 - The drawings and specifications are intended to be explanatory of each other, but, should any discrepancy appear or any misunderstanding arise as to the import of anything contained in either, the explanation of the Engineer shall be final and binding on the Contractor. Any...
Página 98 - Supply, is, shall be or become, directly or indirectly, interested as contracting party, partner, stockholder, surety or otherwise in the performance of the contract, or in the supplies, work or business to which it relates, or in any portion of the profits thereof...
Página 91 - Engineer informed a reasonable time in advance, of the times and places at which he intends to work, in order that lines and grades may be furnished and necessary measurements for record and payment may be made with the minimum of inconvenience to the Engineer or of delay to the Contractor.
Página 97 - All remedies provided in this contract shall be taken and construed as cumulative; that is, in addition to each and every other remedy herein provided; and the company shall have any and all equitable and legal remedies which it would in any case have.