Technical Reports, Volúmenes5-7The District, 1917 |
Dentro del libro
Resultados 1-5 de 51
Página 26
... months . In the appropriate place to correspond with its date , each of the 160 storms is platted as a vertical line whose ends show the highest rainfall record and the twentieth highest record . Thus figure 49 shows at a glance the ...
... months . In the appropriate place to correspond with its date , each of the 160 storms is platted as a vertical line whose ends show the highest rainfall record and the twentieth highest record . Thus figure 49 shows at a glance the ...
Página 28
... month and year of the 29 - year period , 1888-1916 , the average rainfall over the eastern United States was computed and is shown in figure 107. The exact area used included North and South Dakota , Nebraska , Kansas , Oklahoma , and ...
... month and year of the 29 - year period , 1888-1916 , the average rainfall over the eastern United States was computed and is shown in figure 107. The exact area used included North and South Dakota , Nebraska , Kansas , Oklahoma , and ...
Página 29
... month varies between 65 and 80 per cent of the mean rainfall for that month . Similarly , the greatest single day's rainfall in a year is on the average 1.3 inches for a station whose mean annual rainfall is 20 inches ; 1.5 inches where ...
... month varies between 65 and 80 per cent of the mean rainfall for that month . Similarly , the greatest single day's rainfall in a year is on the average 1.3 inches for a station whose mean annual rainfall is 20 inches ; 1.5 inches where ...
Página 30
... months and have followed periods of long continued rains sometimes lasting a month . The maximum definitely recorded flood occurred in 1658. The next greatest was in 1910 , with a maximum rate of runoff of 5.26 second feet per square ...
... months and have followed periods of long continued rains sometimes lasting a month . The maximum definitely recorded flood occurred in 1658. The next greatest was in 1910 , with a maximum rate of runoff of 5.26 second feet per square ...
Página 31
... months when the runoff is a much smaller fraction of the rainfall than in March . Furthermore , most of these heaviest storms occurred farther to the south . In the storm evidence of the last 75 years , there is no indica- tion that the ...
... months when the runoff is a much smaller fraction of the rainfall than in March . Furthermore , most of these heaviest storms occurred farther to the south . In the storm evidence of the last 75 years , there is no indica- tion that the ...
Contenido
214 | |
217 | |
223 | |
226 | |
230 | |
235 | |
241 | |
248 | |
60 | |
66 | |
77 | |
80 | |
100 | |
106 | |
112 | |
113 | |
116 | |
129 | |
181 | |
202 | |
204 | |
208 | |
267 | |
273 | |
9 | |
15 | |
22 | |
33 | |
37 | |
68 | |
75 | |
84 | |
90 | |
123 | |
13 | |
Términos y frases comunes
24-hour rainfall amount Area in Square bbls borrow pits cast iron Cement cent Clearing and grubbing concrete construction Contract Contractor culverts D Max damage dams Dayton Depth in Inches depth of rainfall drainage Drawings dressing and grassing Elbe embankment Engineer estimated Excavation from cut excessive precipitation figures Furnishing vitrified pipe gravel Greatest Average Depth inches fell iron pipe isohyetal isopluvial charts item shall include July 15 June low pressure areas MAP FOR MAXIMUM March material mean low water method Miami Conservancy District Miami River Miami Valley northern occurred Ohio paving payment Period of Maximum pipe culverts pluvial index quadrangle quantities rain rainfall records Reinforcing steel retarding basin Riprap runoff second feet Section Sept sheet piling shown shows slopes Specifications spillway Square Miles stations Storm Area Storm of July Surety Surface dressing temperature time-area-depth curves tion Total Storm unit price
Pasajes populares
Página 101 - Board may notify the Contractor to discontinue all work or any part thereof, under this Contract, by a written notice to be served upon the Contractor...
Página 76 - Obligation is such that if the Principal shall faithfully perform the Contract on his part, and...
Página 100 - If the Contractor shall, without such previous written consent, assign, transfer, convey, sublet, or otherwise dispose of this contract, or of his right, title or interest therein, or any of the moneys to become due under...
Página 102 - ... under and by virtue of this agreement or any part thereof, and in case such expense is less than the sum which would have been payable under this contract, if the same had been completed by said contractor, then the said party of the second part shall be entitled to receive the difference...
Página 97 - Contractor shall employ only competent. employed. skillful men to do the work, and whenever the Engineer shall notify the Contractor, in writing, that any man on the work is, in his opinion, incompetent, unfaithful, disorderly or otherwise unsatisfactory, such man shall be discharged from the work, and shall not again be employed on it, except with the consent of the Engineer. wuTufbor ART- XVII. The Contractor shall comply with the proviriquired sions of Chapter 415, of the Laws of 1897, as amended,...
Página 101 - ... if at any time the Engineer shall be of the opinion and shall so certify in writing to the...
Página 89 - The drawings and specifications are intended to be explanatory of each other, but, should any discrepancy appear or any misunderstanding arise as to the import of anything contained in either, the explanation of the Engineer shall be final and binding on the Contractor. Any...
Página 96 - Supply, is, shall be or become, directly or indirectly, interested as contracting party, partner, stockholder, surety or otherwise in the performance of the contract, or in the supplies, work or business to which it relates, or in any portion of the profits thereof...
Página 89 - Engineer informed a reasonable time in advance, of the times and places at which he intends to work, in order that lines and grades may be furnished and necessary measurements for record and payment may be made with the minimum of inconvenience to the Engineer or of delay to the Contractor.
Página 95 - All remedies provided in this contract shall be taken and construed as cumulative; that is, in addition to each and every other remedy herein provided; and the company shall have any and all equitable and legal remedies which it would in any case have.