Report of the Chief of Engineers U.S. Army, Parte4U.S. Government Printing Office, 1888 Includes the Report of the Mississippi River Commission, 1881-19 . |
Dentro del libro
Resultados 1-5 de 100
Página 2218
... Head of the Passes to the mouth of the Ohio River For surveys and examinations of the Mississippi River from the Head of the Passes to its headwaters — continuing survey . $ 150,000 4,000,000 For work at Columbus , Ky . - continuing ...
... Head of the Passes to the mouth of the Ohio River For surveys and examinations of the Mississippi River from the Head of the Passes to its headwaters — continuing survey . $ 150,000 4,000,000 For work at Columbus , Ky . - continuing ...
Página 2226
... head there may be an uncertainty of 100,000 cubic feet . It appears , then , that the values 294,000 , 263,000 , and 263,000 previously obtained by the method of the paper for excesses of discharge about March 10 , 1883 , over about ...
... head there may be an uncertainty of 100,000 cubic feet . It appears , then , that the values 294,000 , 263,000 , and 263,000 previously obtained by the method of the paper for excesses of discharge about March 10 , 1883 , over about ...
Página 2233
... head , near the west bank of a small chute , 100 meters from the river bank , and 35 meters west of fence around Bass's field . River - bed . - Elevation , 280.9 . Stone in woods about 3 miles below Bass Landing , 25 meters above outlet ...
... head , near the west bank of a small chute , 100 meters from the river bank , and 35 meters west of fence around Bass's field . River - bed . - Elevation , 280.9 . Stone in woods about 3 miles below Bass Landing , 25 meters above outlet ...
Página 2234
... head of Bullerton Tow - head , in narrow clearing , 28 meters from river bank and 32 meters below lower side of yard at lower end of cotton - field . It is 8 meters from woods . Lanier . - Elevation , 250.8 . Stone on right bank nearly ...
... head of Bullerton Tow - head , in narrow clearing , 28 meters from river bank and 32 meters below lower side of yard at lower end of cotton - field . It is 8 meters from woods . Lanier . - Elevation , 250.8 . Stone on right bank nearly ...
Página 2235
... head of same , nearly opposite the head of Long Lake , and 540 meters west from the levee . Rozzell . - Elevation , 1-8.6 . Stone on left bank in the cottonwood timber 14 miles above Friar's Point Landing . It is 50 meters from river ...
... head of same , nearly opposite the head of Long Lake , and 540 meters west from the levee . Rozzell . - Elevation , 1-8.6 . Stone on left bank in the cottonwood timber 14 miles above Friar's Point Landing . It is 50 meters from river ...
Contenido
2191 | |
2192 | |
2213 | |
2215 | |
2282 | |
2313 | |
2316 | |
2319 | |
2628 | |
2659 | |
2683 | |
2687 | |
2749 | |
2766 | |
2769 | |
2803 | |
2320 | |
2334 | |
2345 | |
2357 | |
2371 | |
2378 | |
2388 | |
2391 | |
2398 | |
2404 | |
2430 | |
2431 | |
2525 | |
2543 | |
2621 | |
2804 | |
2810 | |
2816 | |
2828 | |
2911 | |
2919 | |
2937 | |
1 | |
3 | |
4 | |
5 | |
6 | |
9 | |
10 | |
11 | |
Otras ediciones - Ver todas
Términos y frases comunes
approved Board boats Bridge Company channel channel-span channel-way Chief of Engineers City commenced Continuing improvement corporation Corps of Engineers cost cottonwood Creek dike district draw draw-bridge draw-opening draw-span east ENGINEER OFFICE erected expense feet from river free and safe gauge Headquarters Corps hereby high water high-water hundred Improving harbor indorsement Island July June 30 Lake Landing left bank levee Lieut low water Memphis meters miles Mississippi River Mississippi River Commission Missouri River mouth obedient servant obstruction Ohio Connecting Railway Ohio River opening passage piers plan and location proposed bridge railroad bridge Railroad Company Railway Company repairs respectfully revetment right bank river and harbor River Commission road Saint Louis Secretary Secretary of War side spans stone structure submit Tenn Tennessee River thereof thousand dollars tion tows U. S. ARMY United States Army UNITED STATES ENGINEER Washington water-way width
Pasajes populares
Página 2837 - ... at all stages, and the soundings, accurately showing the bed of the stream, the location of any other bridge or bridges, and shall furnish such other information as may be required for a full and satisfactory understanding of the subject ; and until the said plan and location of the bridge are...
Página 2861 - ... security of navigation of said river as the Secretary of War shall prescribe; and to scenic that object the said company or corporation shall submit to the Secretary of War, for his examination and approval, a design and drawings of the bridge, and a map of the location, giving...
Página 2828 - That any bridge constructed under this act, and according to its limitations, shall be a lawful structure, and shall be recognized and known as a post-route, upon which, also, no higher charge shall be made for the transmission over the same of the mails, the troops, and the munitions of war of the United States than the rate per mile paid for the transportation over the railroads or public highways leading to said bridge...
Página 2841 - And in case of any litigation arising from any obstruction or alleged obstruction to the free navigation of said river...
Página 2899 - That any bridge built in accordance with the provisions of this Act shall be a lawful structure and shall be recognized and known as a post route, upon which no higher charge shall be made for the transmission over the same of the mails, the troops, and the munitions of war of the United States than the rate per mile paid for the transportation over any railroad, street railway, or public highway leading to said bridge...
Página 2929 - STATE. — The foregoing act having been presented to the President of the United States for his approval, and not having been returned by him to the house of Congress in which it originated within the time prescribed by the Constitution of the United States, has become a law without his approval.] Fob.
Página 2850 - Either party being dissatisfied with the finding of the referees shall have the right, within ninety days after the making of the award and notice of the same, to appeal by original petition to the United States...
Página 2729 - An Act making appropriations for the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes...
Página 2892 - ... shall conform in using said bridge, all matters at issue between them shall be decided by the Secretary of War, upon a hearing of the allegations and proofs of...
Página 2871 - War ; and in case of any litigation arising from any obstruction or alleged obstruction to navigation created by the construction of any bridge under this Act.