HISTORICAL, PAGE Appointment of Harlem River Bridge Commissioners, Secretary, and Chief Engineer, . Appointment of Board of Experts for Examination of Competitive Designs, Prize De- General Description of Erection, Plant, and Distribution of Materials, Caisson Foundation of Pier II., and Detailed Description of Caisson, Material Excavated; Method of Rock Excavation, Rock Drill, Explosives, etc., The Steel Arches: Dimensions, Flange Plates, Web-Plate, Segments, Pins, Bearings, 35 Computed Variation of Rise, Deformation of Arch, etc., Henri de Dion's Method of Computing Resistance and Deformation, ADDITIONAL PRICES UNDER SECOND SECTION OF CONTRACT, 96 PLATES. I.-FRONTISPIECE. CENTRAL PIER.-Looking South. II.-VIEW OF INTRADOS (from Pier II. to Pier I.). III.-MAP OF UPPER PART OF NEW YORK CITY. Showing location of Washington Bridge IV. EARLY DESIGNS FOR HARLEM River BridGE (10 Engravings). NO. 1 TO 4, DE- V. ELEVATIONS OF PRIZE Designs, by C. C. SCHNEIDER AND BY W. HILDENBRAND, VI. THE WASHINGTON BRIDGE. General View from the South. VII-VIEW FROM THE SOUTH-WEST (PART OF METAL ARCH). VIII-BEARING OF STEEL ARCHES UPON PIER III. IX.-VIEW OF ROADWAY. Looking West. X.-GAS AND ELECTRIC LAMPS, AND PARAPETS OVER PIERS. XI.-BALUSTRADE AND DETAILS. XII. VIEW FROM THE NORTH-EAST. XIII-CONTRACT DRAWINGS. SECTIONS OF ABUTMENTS AS PROPOSED; ELEVATION OF XIV. STRAIN SHEETS SUBMITTED BY CONTRACTORS, WITH PROPOSALS. V し XVIII. PIER II. Sept. 8, 1887. XIX.--PEDESTALS, PIER III. Sept. 8, 1887. BEARING OF STEEL ARCHES, PIER III.; RIVETING MACHINE AT WORK. XX.-WEST SIDE. Nov. 4, 1887. XXI.-WEST SIDE. Looking North-East-Nov. 4, 1887-showing Centering. XXII. Two VIEWS-PIER II., LAND SPAN, AND EAST SIDE. Nov. 4, 1887. THREE VIEWS-WEST SIDE, LAND SPAN, AND EAST SIDE. Dec. 24, 1887. XXIV.-WEST SIDE. March 23, 1888. XXV.—RIVER SPAN. March 23, 1888 (False Works of River Span). XXVI.-TWO VIEWS-RIVER AND LAND SPANS, AND EAST SIDE. March 23, 1888. XXVII.-Two VIEWS--FLOOR-BEAMS AND BUCKLE PLATES. May 7 and May 18, 1888. XXIX.-LAND AND RIVER SPANS. August 24, 1888. XXX.--STAIRWAY. August 24, 1888. XXXI.-THREE VIEWS--WEST SIDE, LAND SPAN, AND EAST SIDE. Nov. 1, 1888. XXXII-GENERAL ELEVATION AND PLAN OF WASHINGTON BRIDGE, Scale 60 feet to inch. PLATES. SERIES OF PLATES SHOWING MASONRY WORK. XXXIII.-DETAIL PLANS OF CAISSON FOUNDATION OF PIER II. XXXIV. METHOD OF ROCK EXCAVATION IN CAISSON. XXXV.-ELEVATION OF PIER I., WEST ABUTMENT AND APPROACH AND PART PLAN. XXXVII.-SECTIONS OF PIER II. AND PLANS. XXXVIII.-ELEVATION OF PIER III. EAST ABUTMENT AND APPROACH AND PART PLAN. XL.-DETAILS OF MASONRY, MAIN CORNICE AND PARAPET ON ABUTMENTS AND XLI.-DETAILS OF MASONRY. INTERIORS OF PARAPET OVER PIERS AND SECTIONS OF XLII.-JOINING OF MASONRY AND METAL WORK AT FLOOR LEVEL. XLIII. CENTRES FOR LARGE MASONRY ARCHES. SERIES OF PLATES SHOWING METAL WORK. XLIV.--LONGITUDINAL SECTION ON CENTRE LINE OF ONE ARCH. (ELEVATION OF INNER RIB.) XLV. SECTION THROUGH PANEL 4 OF STEEL ARCH, SHOWING ALSO ROADWAY. XLVI. PEDESTAL AND FIRST SEGMENT OF STEEL ARCH. SKEW-BACK, FLANGE OF FIRST XLVII. INTERMEDIATE SEGMENT (No. 5). XLVIII.-JOINT of Segments of STEEL ARCHES. SECTION OF FLANGE. XLIX. LATERAL BRACING BETWEEN RIBS. L.-SECTIONS OF METAL STRUCTURE TO SHOW GENERAL ARRANGEMENT. LII. TRANSVERSE FLOOR-BEAMS. LIII. BUCKLE PLATES AND FLOORING. V LIV. ANCHORAGE OF METAL Floor to MASONRY AND EXPANSION JOINT. V LV. DETAILS OF CONNECTION OF METAL WORK AND MASONRY; EXPANSION LVI-FALSE WORKS FOR EACH METAL SPAN. LVII-SECTION OF IRON CORNICE AND BALUSTRADE. } LVIII. ELEVATION OF IRON CORNICE AND BALUSTRADE. LIX. ERECTION PLANT AND LOCATION PLANS, GENERAL ELEVATION AND PLAN. LXII. DE DION'S METHOD FOR DEFLECTIONS. LXIII.-ELEVATIONS OF EXISTING METAL ARCH BRIDGES OF OVER 500 FEET SPAN: 1 |