Draw bridge, Milwaukee, $11,000; draw bridge, 14,500 00 89,900 00 77,000 00 Masonry and bridging N. La Crosse to Miss. river.. Culvert masonry, pile frame and timber culverts, road bridges, pile abutments, plank boxes and and drains, cattle guards, highway crossings, road signs and whistling posts... SCHEDULE 9. 195,000 00 $476, 580 00 $149,883 00 34, 010 00 800 00 $184,693 00 2,331 ms. spikes, F bars and bolts, @$643. Amount. Estimated cost of superstructure of one mile of main track. 944 tons iron rails, 60 fb per 'yard de 2,640 $80 00 $7,540 00 310 00 1,320 00 $9,903 1,000 $10, 903 oak ties, 8 feet, 6x8 delivered.... To laying and surfacing at S. G., loading and unloading Ballasting and final surfacing... One Mile Side Track. Rails, spikes, suplies, ties and laying. $9,903 00 $11,853 9 switches, $150 each.. Cost of side track over main track... Add for contingent waste and loss. $950 00 Totals 221, 500 110, 100 9, 400 64, 100 131,700 35,100 512,500 100 1 Furniture, twenty-eight stations. 2 Twenty-five cattle yards. Hand car houses. Right of way, as per accompanying Schedule..... $87,500 40,000 Grading, as per schedule... $127,500 336, 700 Masonry, as per schedule.. Bridging, as per schedule... 56,000 Total cash valuation substructure. Ties 38.83 Miles..... 392,700 51,255 Iron rails,.. [No. miles, 38.83; lbs. wt. per yd. 60]. 292, 778 27,478 Laying track $400, ballasting $1,000.. 54,362 as per schedule; ..... sort fencing, etc.... tion.... Total cash valuation of superstructure.. Passengers stations and fixtures, as per schedule Freight stations and fixtures, as schedule.... Fencing;.... Total cash valuation of buildings of every Engineering expenses before and during construc Salaries of officers and agents essential during construction .. Total cost of engineering and official management during construction... Total cash value of line unequipped..... Two Railroad Crossing in Madison Depot Grounds. [No., miles, 36] 28,800 48,300 29, 600 6,100 35.700 $1,030,073 SCHEDULE 4.-Masonry and Bridging. Culverts, bridges, road crossings and signs, cattle guards, etc... $336,700 $56,000 Right of way, as per accompanying schedule Masonry, as per schedule. Bridging, as per schedule: [No. iron bridges, 1] Ties: 118.5 miles 156,420 Iron rails: [No. miles, 118.5; lbs. wt. per yard, 60] Total cash valuation of superstructure. 1,306,695 Passenger stations and fixtures, as per schedule. Freight stations and fixtures, as per schedule. 102,400 Machine shops, as per schedule...... 249, 100 Machinery and fixtures, as per schedule Turn tables, as per schedule as per schedule.. Fencing... ...... Engine houses, as per schedule Wood sheds and water stations, and miscellaneous, Elevators, as per schedule... Total cash valuation of buildings of every sort, 35,000 3,600 61,000 80,000 93,000 |