Imágenes de páginas
PDF
EPUB
[blocks in formation]

Draw bridge, Milwaukee, $11,000; draw bridge,
Portage, $3,500

14,500 00

89,900 00

77,000 00

Masonry and bridging N. La Crosse to Miss. river.. Culvert masonry, pile frame and timber culverts, road bridges, pile abutments, plank boxes and and drains, cattle guards, highway crossings, road signs and whistling posts...

SCHEDULE 9.

195,000 00

$476, 580 00

$149,883 00 34, 010 00 800 00

$184,693 00

2,331 ms. spikes, F bars and bolts, @$643.
Extra cost of side tracks, 35, 8ms, @$950
2 R. R. crossings....

Amount.

Estimated cost of superstructure of one mile of main track.

944 tons iron rails, 60 fb per 'yard de

[blocks in formation]

2,640

$80 00 $7,540 00

310 00

[blocks in formation]

1,320 00
400 00

$9,903

1,000

$10, 903

oak ties, 8 feet, 6x8 delivered....

To laying and surfacing at S. G., loading and unloading

Ballasting and final surfacing...

One Mile Side Track.

Rails, spikes, suplies, ties and laying.
Ballasting per mile....

$9,903 00
600 00
1,350 00

$11,853

9 switches, $150 each..

Cost of side track over main track...

Add for contingent waste and loss.

$950 00

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]

Totals

221, 500 110, 100 9, 400 64, 100 131,700 35,100 512,500

100

1 Furniture, twenty-eight stations. 2 Twenty-five cattle yards. Hand car houses.

[blocks in formation]

Right of way, as per accompanying Schedule.....
Land for Depot, Stations, etc., as per schedule
Total cash valuation of all lands purchased

$87,500

40,000

Grading, as per schedule...

$127,500

336, 700

Masonry, as per schedule..

Bridging, as per schedule...

56,000

Total cash valuation substructure.

Ties 38.83 Miles.....

392,700

51,255

Iron rails,.. [No. miles, 38.83; lbs. wt. per yd. 60].
Chairs, spikes, fish-bar, etc.

292, 778

27,478

Laying track $400, ballasting $1,000..

54,362

as per schedule; .....

sort fencing, etc....

tion....

Total cash valuation of superstructure..

Passengers stations and fixtures, as per schedule

Freight stations and fixtures, as schedule....
Wood sheds and water stations and miscellaneous,

Fencing;....

Total cash valuation of buildings of every

Engineering expenses before and during construc

Salaries of officers and agents essential during construction ..

Total cost of engineering and official management during construction...

Total cash value of line unequipped.....

Two Railroad Crossing in Madison Depot Grounds.

[blocks in formation]

[No., miles, 36]

28,800

48,300

29, 600

6,100

35.700

$1,030,073

[blocks in formation]

SCHEDULE 4.-Masonry and Bridging.

Culverts, bridges, road crossings and signs, cattle guards, etc...

$336,700

$56,000

[blocks in formation]
[blocks in formation]

Right of way, as per accompanying schedule
Land for depots, stations, etc., as per schedule
Total cash valuation of all lands purchased...
Grading, as per schedule

Masonry, as per schedule.

Bridging, as per schedule: [No. iron bridges, 1]
Total cash valuation of substructure.

[blocks in formation]

Ties: 118.5 miles

156,420

Iron rails: [No. miles, 118.5; lbs. wt. per yard, 60]
Chairs, spikes, fish-bars, etc., schedule* 9...
Laying track, $400; ballasting, $1,000...

[blocks in formation]

Total cash valuation of superstructure.

1,306,695

Passenger stations and fixtures, as per schedule.

Freight stations and fixtures, as per schedule.
Engine and car shops, as per schedule.....

102,400

Machine shops, as per schedule......

249, 100

Machinery and fixtures, as per schedule

Turn tables, as per schedule

as per schedule..

Fencing...

......

Engine houses, as per schedule

Wood sheds and water stations, and miscellaneous,

Elevators, as per schedule...

Total cash valuation of buildings of every sort,

35,000

3,600

61,000

80,000

93,000

[blocks in formation]
« AnteriorContinuar »