Report A-[F] of Commission on Electric Lighting for the City of New York ...: Submitted to the Board of Estimate and Apportionment. Commission: Cary T. Hutchinson, Chairman ...1906 |
Dentro del libro
Resultados 1-5 de 30
Página 1
... Bronx that are now lighted by electricity , and to light all the public buildings by electricity that are now lighted either by electricity or gas , or by both . ( B ) Report on cost of construction and opera- tion of a plant to supply ...
... Bronx that are now lighted by electricity , and to light all the public buildings by electricity that are now lighted either by electricity or gas , or by both . ( B ) Report on cost of construction and opera- tion of a plant to supply ...
Página 2
... Bronx , a second for the supply of Brook- lyn and Queens , and a third for the supply of Rich- mond . The stations for Manhattan and The Bronx and for Brooklyn and Queens would be in- terconnected , so that either station can supply ...
... Bronx , a second for the supply of Brook- lyn and Queens , and a third for the supply of Rich- mond . The stations for Manhattan and The Bronx and for Brooklyn and Queens would be in- terconnected , so that either station can supply ...
Página 4
... BRONX THAT ARE NOW LIGHTED BY ELECTRICITY , AND TO LIGHT ALL THE PUBLIC BUILDINGS BY ELECTRICITY THAT ARE NOW LIGHTED EITHER BY ELECTRICITY OR GAS , OR BY Вотн . This report is based on the report made to the Commissioner of the ...
... BRONX THAT ARE NOW LIGHTED BY ELECTRICITY , AND TO LIGHT ALL THE PUBLIC BUILDINGS BY ELECTRICITY THAT ARE NOW LIGHTED EITHER BY ELECTRICITY OR GAS , OR BY Вотн . This report is based on the report made to the Commissioner of the ...
Página 5
... Bronx and for 250 000 sixteen candle - power incandescent lamp equivalents , will be ..... $ 1 250 000 $ 2 850 000 The total cost of the complete system will then be .. $ 4 100 000 Costs . COST OF OPERATION . ARC LAMP- We estimate that ...
... Bronx and for 250 000 sixteen candle - power incandescent lamp equivalents , will be ..... $ 1 250 000 $ 2 850 000 The total cost of the complete system will then be .. $ 4 100 000 Costs . COST OF OPERATION . ARC LAMP- We estimate that ...
Página 7
... Bronx of The City of New York . There are now in service 5 000 arc lamps in the Boroughs of Manhattan and Bronx and a total equivalent connected capacity of 160 000 sixteen candle . power incandescent lamps . There should be at least 10 ...
... Bronx of The City of New York . There are now in service 5 000 arc lamps in the Boroughs of Manhattan and Bronx and a total equivalent connected capacity of 160 000 sixteen candle . power incandescent lamps . There should be at least 10 ...
Otras ediciones - Ver todas
Report A-[F] of Commission on Electric Lighting for the City of New York ... New York (N y ) Commission on Electric L Sin vista previa disponible - 2015 |
Términos y frases comunes
000 kilowatt-hours 000 kilowatts approved arc lamps arc lights basement floor blow-off boiler feed pumps boiler room Boroughs brass Bronx Brooklyn Brooklyn and Queens bulkhead busbars capacity cast iron cement central station cents City clean coal bunkers COMMISSION ON ELECTRIC Commissioner complete concrete condenser connected construction contract Contractor copper diameter doors drawings duct ELECTRIC LIGHTING Engineer equipment estimate extra heavy face brick feeders feet finished fittings flanges flue furnished galvanized gate valves grade incandescent lighting incandescent service inch intake iron pipe iron pipe size joints load located Manhattan masonry material mortar necessary nickel plated oil switches operating plant plaster plumbing Portland cement Power House pressure public buildings Report Richmond roof sash seawall specifications steam stone storage streets structural steel sub-stations superheater supply surface surge tank thick tile tion total annual cost total cost wall water closet wattmeter wrought iron York
Pasajes populares
Página 33 - ... in case of such discontinuance of the employment of the contractor he shall not be entitled to receive any further payment under this contract until the said work shall be wholly finished, at which time, if the unpaid balance of the amount to be paid under this contract shall exceed the expense Incurred by the owner in finishing the work, such excess shall be paid by the owner to the contractor...
Página 33 - ... written notice to the contractor, to provide any such labor or materials, and to deduct the cost thereof from any money then due or thereafter to become due to the contractor under...
Página 33 - Should the Contractor at any time refuse or neglect to supply a sufficiency of properly skilled workmen, or of materials of the proper quality, or fail in any respect to prosecute the work wIth promptness and diligence, or fail in the performance of any of the agreements herein contained, such refusal, neglect or failure being certified by the Architects, the Owner shall be at liberty, after three days...
Página 10 - DOLLAKS for each and every day the time consumed in said performance and completion may exceed the time hereinbefore allowed for that purpose; which said sum, in view of the difficulty of ascertaining the loss which The...