Report A-[F] of Commission on Electric Lighting for the City of New York ...: Submitted to the Board of Estimate and Apportionment. Commission: Cary T. Hutchinson, Chairman ...1906 |
Dentro del libro
Resultados 1-5 de 100
Página 20
... approve or issue for the purpose of insuring the thorough completion of the work in the most efficient manner . ( a ) The power house to be built under these specifications , together with all accessories and ap- purtenances described ...
... approve or issue for the purpose of insuring the thorough completion of the work in the most efficient manner . ( a ) The power house to be built under these specifications , together with all accessories and ap- purtenances described ...
Página 21
... approval of the Engineer as hereinafter set forth . 1. Topographical Cross - section of Property for Power House . 2. Study of Power House , Front Elevation . 3. Study of Power House , Side Elevation . 4. Plan of Power House with ...
... approval of the Engineer as hereinafter set forth . 1. Topographical Cross - section of Property for Power House . 2. Study of Power House , Front Elevation . 3. Study of Power House , Side Elevation . 4. Plan of Power House with ...
Página 22
... approved by the Engineer , they shall be submitted in triplicate for final approval . One set will be returned to the Contractor for record and two sets will be retained by the Engineer for records of the Department . Such additional ...
... approved by the Engineer , they shall be submitted in triplicate for final approval . One set will be returned to the Contractor for record and two sets will be retained by the Engineer for records of the Department . Such additional ...
Página 24
... approval of the Engineer . Upon the approval of the Engineer , a special written order will be issued by the Commissioner for the said addition , deduction or change , before the work shall be begun . ( c ) Credit shall be allowed by ...
... approval of the Engineer . Upon the approval of the Engineer , a special written order will be issued by the Commissioner for the said addition , deduction or change , before the work shall be begun . ( c ) Credit shall be allowed by ...
Página 28
... approval of the Engineer . ( a ) When the contract is signed the Commis- sioner will serve notice upon the Contractor , giv- ing the date at which the Contractor shall begin work , and the time at which the contract is started and the ...
... approval of the Engineer . ( a ) When the contract is signed the Commis- sioner will serve notice upon the Contractor , giv- ing the date at which the Contractor shall begin work , and the time at which the contract is started and the ...
Otras ediciones - Ver todas
Report A-[F] of Commission on Electric Lighting for the City of New York ... New York (N y ) Commission on Electric L Sin vista previa disponible - 2015 |
Términos y frases comunes
000 kilowatt-hours 000 kilowatts approved arc lamps arc lights basement floor blow-off boiler feed pumps boiler room Boroughs brass Bronx Brooklyn Brooklyn and Queens bulkhead busbars capacity cast iron cement central station cents City clean coal bunkers COMMISSION ON ELECTRIC Commissioner complete concrete condenser connected construction contract Contractor copper diameter doors drawings duct ELECTRIC LIGHTING Engineer equipment estimate extra heavy face brick feeders feet finished fittings flanges flue furnished galvanized gate valves grade incandescent lighting incandescent service inch intake iron pipe iron pipe size joints load located Manhattan masonry material mortar necessary nickel plated oil switches operating plant plaster plumbing Portland cement Power House pressure public buildings Report Richmond roof sash seawall specifications steam stone storage streets structural steel sub-stations superheater supply surface surge tank thick tile tion total annual cost total cost wall water closet wattmeter wrought iron York
Pasajes populares
Página 33 - ... in case of such discontinuance of the employment of the contractor he shall not be entitled to receive any further payment under this contract until the said work shall be wholly finished, at which time, if the unpaid balance of the amount to be paid under this contract shall exceed the expense Incurred by the owner in finishing the work, such excess shall be paid by the owner to the contractor...
Página 33 - ... written notice to the contractor, to provide any such labor or materials, and to deduct the cost thereof from any money then due or thereafter to become due to the contractor under...
Página 33 - Should the Contractor at any time refuse or neglect to supply a sufficiency of properly skilled workmen, or of materials of the proper quality, or fail in any respect to prosecute the work wIth promptness and diligence, or fail in the performance of any of the agreements herein contained, such refusal, neglect or failure being certified by the Architects, the Owner shall be at liberty, after three days...
Página 10 - DOLLAKS for each and every day the time consumed in said performance and completion may exceed the time hereinbefore allowed for that purpose; which said sum, in view of the difficulty of ascertaining the loss which The...