Report A-[F] of Commission on Electric Lighting for the City of New York ...: Submitted to the Board of Estimate and Apportionment. Commission: Cary T. Hutchinson, Chairman ...1906 |
Dentro del libro
Resultados 1-5 de 56
Página 5
... coal storage , coal- handling apparatus , building , complete boiler plant equipment , engines , generators , switchboards , ready to deliver power to high - pressure feeders , interest during construction , but excluding real estate ...
... coal storage , coal- handling apparatus , building , complete boiler plant equipment , engines , generators , switchboards , ready to deliver power to high - pressure feeders , interest during construction , but excluding real estate ...
Página 10
... coal and water . The feeder lengths will be less than estimated for any other probable site . Blackwell's Island has the additional advantage of permitting easy access to Brooklyn . In Manhattan there will be five sub - stations ...
... coal and water . The feeder lengths will be less than estimated for any other probable site . Blackwell's Island has the additional advantage of permitting easy access to Brooklyn . In Manhattan there will be five sub - stations ...
Página 12
... coal and ash handling machinery , stokers , economizers , superheaters and all accessories ; and vertical , cross - compound , condensing engines of the Corliss type , each direct - connected to 60 - cycle , three- phase , 80 ...
... coal and ash handling machinery , stokers , economizers , superheaters and all accessories ; and vertical , cross - compound , condensing engines of the Corliss type , each direct - connected to 60 - cycle , three- phase , 80 ...
Página 17
... coal is calculated on the assumption Coal . of 3 pounds of coal per kilowatt hour , with coal at $ 3 per long ton alongside the pier ; water is charged at the cost to the City . The annual output of the station will be 24 000 000 ...
... coal is calculated on the assumption Coal . of 3 pounds of coal per kilowatt hour , with coal at $ 3 per long ton alongside the pier ; water is charged at the cost to the City . The annual output of the station will be 24 000 000 ...
Página 19
... coal not used , will be $ 69.40 . The annual cost per arc light , with a plant to supply 5 000 arcs will be $ 80.80 , making the same allowances . The total cost for this plant will be- Operating expenses Depreciation Interest Total ...
... coal not used , will be $ 69.40 . The annual cost per arc light , with a plant to supply 5 000 arcs will be $ 80.80 , making the same allowances . The total cost for this plant will be- Operating expenses Depreciation Interest Total ...
Otras ediciones - Ver todas
Report A-[F] of Commission on Electric Lighting for the City of New York ... New York (N y ) Commission on Electric L Sin vista previa disponible - 2015 |
Términos y frases comunes
000 kilowatt-hours 000 kilowatts approved arc lamps arc lights basement floor blow-off boiler feed pumps boiler room Boroughs brass Bronx Brooklyn Brooklyn and Queens bulkhead busbars capacity cast iron cement central station cents City clean coal bunkers COMMISSION ON ELECTRIC Commissioner complete concrete condenser connected construction contract Contractor copper diameter doors drawings duct ELECTRIC LIGHTING Engineer equipment estimate extra heavy face brick feeders feet finished fittings flanges flue furnished galvanized gate valves grade incandescent lighting incandescent service inch intake iron pipe iron pipe size joints load located Manhattan masonry material mortar necessary nickel plated oil switches operating plant plaster plumbing Portland cement Power House pressure public buildings Report Richmond roof sash seawall specifications steam stone storage streets structural steel sub-stations superheater supply surface surge tank thick tile tion total annual cost total cost wall water closet wattmeter wrought iron York
Pasajes populares
Página 33 - ... in case of such discontinuance of the employment of the contractor he shall not be entitled to receive any further payment under this contract until the said work shall be wholly finished, at which time, if the unpaid balance of the amount to be paid under this contract shall exceed the expense Incurred by the owner in finishing the work, such excess shall be paid by the owner to the contractor...
Página 33 - ... written notice to the contractor, to provide any such labor or materials, and to deduct the cost thereof from any money then due or thereafter to become due to the contractor under...
Página 33 - Should the Contractor at any time refuse or neglect to supply a sufficiency of properly skilled workmen, or of materials of the proper quality, or fail in any respect to prosecute the work wIth promptness and diligence, or fail in the performance of any of the agreements herein contained, such refusal, neglect or failure being certified by the Architects, the Owner shall be at liberty, after three days...
Página 10 - DOLLAKS for each and every day the time consumed in said performance and completion may exceed the time hereinbefore allowed for that purpose; which said sum, in view of the difficulty of ascertaining the loss which The...