... entire exclusion of gas , -for streets , parks , public buildings and other public places . This plant built in accordance with these specifications will ensure service equal to or bet- ter than that now given . Including land ...
... entire exclusion of gas , -for streets , parks , public buildings and other public places . This plant built in accordance with these specifications will ensure service equal to or bet- ter than that now given . Including land ...
Página 3
... entire exclu- sion of gas , naphtha and other illuminants , in the Boroughs of Manhattan and The Bronx . At pres- ent 290 miles of streets in Manhattan and The Bronx are lighted by electricity and 442 miles by gas or naphtha , -a total ...
... entire exclu- sion of gas , naphtha and other illuminants , in the Boroughs of Manhattan and The Bronx . At pres- ent 290 miles of streets in Manhattan and The Bronx are lighted by electricity and 442 miles by gas or naphtha , -a total ...
Página 5
... entire electric supply in the form of alter- nating current , three phase , at 11 000 volts , and 60 cycles , with one power station for the Boroughs of Manhattan and The Bronx ; the delivery of this power to nine sub - stations in ...
... entire electric supply in the form of alter- nating current , three phase , at 11 000 volts , and 60 cycles , with one power station for the Boroughs of Manhattan and The Bronx ; the delivery of this power to nine sub - stations in ...
Página 8
... entire service supplied from it . In the sub - station an inspector will have living quarters , supplies will be carried , lamps cleaned and repairs made . The machinery can be placed upon one floor , and the upper one or two stories ...
... entire service supplied from it . In the sub - station an inspector will have living quarters , supplies will be carried , lamps cleaned and repairs made . The machinery can be placed upon one floor , and the upper one or two stories ...
Página 20
... entire completion of the work and as to all other circumstances affecting the cost of the per- formance of this contract except where specific- ally provided for to the contrary in these specifi- cations . ( d ) The Contractor shall ...
... entire completion of the work and as to all other circumstances affecting the cost of the per- formance of this contract except where specific- ally provided for to the contrary in these specifi- cations . ( d ) The Contractor shall ...
Otras ediciones - Ver todas
Report A-[F] of Commission on Electric Lighting for the City of New York ... New York (N y ) Commission on Electric L Sin vista previa disponible - 2015 |
Términos y frases comunes
000 kilowatt-hours 000 kilowatts approved arc lamps arc lights basement floor blow-off boiler feed pumps boiler room Boroughs brass Bronx Brooklyn Brooklyn and Queens bulkhead busbars capacity cast iron cement central station cents City clean coal bunkers COMMISSION ON ELECTRIC Commissioner complete concrete condenser connected construction contract Contractor copper diameter doors drawings duct ELECTRIC LIGHTING Engineer equipment estimate extra heavy face brick feeders feet finished fittings flanges flue furnished galvanized gate valves grade incandescent lighting incandescent service inch intake iron pipe iron pipe size joints load located Manhattan masonry material mortar necessary nickel plated oil switches operating plant plaster plumbing Portland cement Power House pressure public buildings Report Richmond roof sash seawall specifications steam stone storage streets structural steel sub-stations superheater supply surface surge tank thick tile tion total annual cost total cost wall water closet wattmeter wrought iron York
Pasajes populares
Página 33 - ... in case of such discontinuance of the employment of the contractor he shall not be entitled to receive any further payment under this contract until the said work shall be wholly finished, at which time, if the unpaid balance of the amount to be paid under this contract shall exceed the expense Incurred by the owner in finishing the work, such excess shall be paid by the owner to the contractor...
Página 33 - ... written notice to the contractor, to provide any such labor or materials, and to deduct the cost thereof from any money then due or thereafter to become due to the contractor under...
Página 33 - Should the Contractor at any time refuse or neglect to supply a sufficiency of properly skilled workmen, or of materials of the proper quality, or fail in any respect to prosecute the work wIth promptness and diligence, or fail in the performance of any of the agreements herein contained, such refusal, neglect or failure being certified by the Architects, the Owner shall be at liberty, after three days...
Página 10 - DOLLAKS for each and every day the time consumed in said performance and completion may exceed the time hereinbefore allowed for that purpose; which said sum, in view of the difficulty of ascertaining the loss which The...