... fittings and plumbing , and two masonry chimneys , all of sufficient size to contain equipment of 20 000 kilowatts ..... Land and Building .. Complete equipment for 15,000 kilowatts , includ- ing boiler plant , turbo - generators , oil ...
... fittings and plumbing , and two masonry chimneys , all of sufficient size to contain equipment of 20 000 kilowatts ..... Land and Building .. Complete equipment for 15,000 kilowatts , includ- ing boiler plant , turbo - generators , oil ...
Página 84
... fittings are to be extra heavy wrought iron of a weight and quality that will be approved by the Department of Buildings . The weight and maker's name is to be stamped on each length of pipe . All soil , waste , vent pipe and fittings ...
... fittings are to be extra heavy wrought iron of a weight and quality that will be approved by the Department of Buildings . The weight and maker's name is to be stamped on each length of pipe . All soil , waste , vent pipe and fittings ...
Página 85
... fittings for vent , soil and waste lines are to be of the drainage pattern ; branch soil pipes and lead connections to water closets are to be 4 in . diameter with 4 in . traps and 2 in . vents ; urinals 2 in .; branch wastes 11⁄2 in ...
... fittings for vent , soil and waste lines are to be of the drainage pattern ; branch soil pipes and lead connections to water closets are to be 4 in . diameter with 4 in . traps and 2 in . vents ; urinals 2 in .; branch wastes 11⁄2 in ...
Página 86
... fittings are to be of malle- able galvanized iron . All exposed supply , waste and vent lines in toilet rooms , are to be nickel plated standard weight brass pipe . ( f ) Toilet Rooms . - A toilet room shall be lo- cated in basement ...
... fittings are to be of malle- able galvanized iron . All exposed supply , waste and vent lines in toilet rooms , are to be nickel plated standard weight brass pipe . ( f ) Toilet Rooms . - A toilet room shall be lo- cated in basement ...
Página 87
... fittings and with such other appliances as will reasonably be in- cluded within the scope of the matters to be sup- plied for the plumbing work of the structure , whether such matters or appliances are herein mentioned or shown on the ...
... fittings and with such other appliances as will reasonably be in- cluded within the scope of the matters to be sup- plied for the plumbing work of the structure , whether such matters or appliances are herein mentioned or shown on the ...
Otras ediciones - Ver todas
Report A-[F] of Commission on Electric Lighting for the City of New York ... New York (N y ) Commission on Electric L Sin vista previa disponible - 2015 |
Términos y frases comunes
000 kilowatt-hours 000 kilowatts approved arc lamps arc lights basement floor blow-off boiler feed pumps boiler room Boroughs brass Bronx Brooklyn Brooklyn and Queens bulkhead busbars capacity cast iron cement central station cents City clean coal bunkers COMMISSION ON ELECTRIC Commissioner complete concrete condenser connected construction contract Contractor copper diameter doors drawings duct ELECTRIC LIGHTING Engineer equipment estimate extra heavy face brick feeders feet finished fittings flanges flue furnished galvanized gate valves grade incandescent lighting incandescent service inch intake iron pipe iron pipe size joints load located Manhattan masonry material mortar necessary nickel plated oil switches operating plant plaster plumbing Portland cement Power House pressure public buildings Report Richmond roof sash seawall specifications steam stone storage streets structural steel sub-stations superheater supply surface surge tank thick tile tion total annual cost total cost wall water closet wattmeter wrought iron York
Pasajes populares
Página 33 - ... in case of such discontinuance of the employment of the contractor he shall not be entitled to receive any further payment under this contract until the said work shall be wholly finished, at which time, if the unpaid balance of the amount to be paid under this contract shall exceed the expense Incurred by the owner in finishing the work, such excess shall be paid by the owner to the contractor...
Página 33 - ... written notice to the contractor, to provide any such labor or materials, and to deduct the cost thereof from any money then due or thereafter to become due to the contractor under...
Página 33 - Should the Contractor at any time refuse or neglect to supply a sufficiency of properly skilled workmen, or of materials of the proper quality, or fail in any respect to prosecute the work wIth promptness and diligence, or fail in the performance of any of the agreements herein contained, such refusal, neglect or failure being certified by the Architects, the Owner shall be at liberty, after three days...
Página 10 - DOLLAKS for each and every day the time consumed in said performance and completion may exceed the time hereinbefore allowed for that purpose; which said sum, in view of the difficulty of ascertaining the loss which The...