Report A-[F] of Commission on Electric Lighting for the City of New York ...: Submitted to the Board of Estimate and Apportionment. Commission: Cary T. Hutchinson, Chairman ...1906 |
Dentro del libro
Resultados 1-5 de 83
Página 8
... floor , and the upper one or two stories , as the case may be , left for living rooms and for supply and repair depots . The plans provide for the use of a 7.5 ampere , alternating - current series , enclosed arc lamp requiring about ...
... floor , and the upper one or two stories , as the case may be , left for living rooms and for supply and repair depots . The plans provide for the use of a 7.5 ampere , alternating - current series , enclosed arc lamp requiring about ...
Página 38
... floor to the roof . A basement is to be provided under boiler room , turbine room and wings . ( b ) A coal handling and storage plant is to be located between the Power House Building and the East River . ( c ) One intake and one ...
... floor to the roof . A basement is to be provided under boiler room , turbine room and wings . ( b ) A coal handling and storage plant is to be located between the Power House Building and the East River . ( c ) One intake and one ...
Página 39
... floor , to make the floor self - draining : Basement floor Grade 3.5 Boiler room floor 66 19.5 Turbine room floor 66 23.5 First switch board gallery floor 66 39.5 Second switch board gallery floor Inside bottom of smoke flue over ...
... floor , to make the floor self - draining : Basement floor Grade 3.5 Boiler room floor 66 19.5 Turbine room floor 66 23.5 First switch board gallery floor 66 39.5 Second switch board gallery floor Inside bottom of smoke flue over ...
Página 42
... flooring . ( c ) Lime . - All lime is to be of best quality , thoroughly burned and not slacked when opened for use . Especial care is to be taken in shipment and in storing same on the premises to protect from weather and to keep same ...
... flooring . ( c ) Lime . - All lime is to be of best quality , thoroughly burned and not slacked when opened for use . Especial care is to be taken in shipment and in storing same on the premises to protect from weather and to keep same ...
Página 50
... floors , partitions , roofing , face work of structure and other masonry constructions as are herein described or shown on the plans and as are located above a datum line established four ( 4 ) inches below the sidewalk or area way ...
... floors , partitions , roofing , face work of structure and other masonry constructions as are herein described or shown on the plans and as are located above a datum line established four ( 4 ) inches below the sidewalk or area way ...
Otras ediciones - Ver todas
Report A-[F] of Commission on Electric Lighting for the City of New York ... New York (N y ) Commission on Electric L Sin vista previa disponible - 2015 |
Términos y frases comunes
000 kilowatt-hours 000 kilowatts approved arc lamps arc lights basement floor blow-off boiler feed pumps boiler room Boroughs brass Bronx Brooklyn Brooklyn and Queens bulkhead busbars capacity cast iron cement central station cents City clean coal bunkers COMMISSION ON ELECTRIC Commissioner complete concrete condenser connected construction contract Contractor copper diameter doors drawings duct ELECTRIC LIGHTING Engineer equipment estimate extra heavy face brick feeders feet finished fittings flanges flue furnished galvanized gate valves grade incandescent lighting incandescent service inch intake iron pipe iron pipe size joints load located Manhattan masonry material mortar necessary nickel plated oil switches operating plant plaster plumbing Portland cement Power House pressure public buildings Report Richmond roof sash seawall specifications steam stone storage streets structural steel sub-stations superheater supply surface surge tank thick tile tion total annual cost total cost wall water closet wattmeter wrought iron York
Pasajes populares
Página 33 - ... in case of such discontinuance of the employment of the contractor he shall not be entitled to receive any further payment under this contract until the said work shall be wholly finished, at which time, if the unpaid balance of the amount to be paid under this contract shall exceed the expense Incurred by the owner in finishing the work, such excess shall be paid by the owner to the contractor...
Página 33 - ... written notice to the contractor, to provide any such labor or materials, and to deduct the cost thereof from any money then due or thereafter to become due to the contractor under...
Página 33 - Should the Contractor at any time refuse or neglect to supply a sufficiency of properly skilled workmen, or of materials of the proper quality, or fail in any respect to prosecute the work wIth promptness and diligence, or fail in the performance of any of the agreements herein contained, such refusal, neglect or failure being certified by the Architects, the Owner shall be at liberty, after three days...
Página 10 - DOLLAKS for each and every day the time consumed in said performance and completion may exceed the time hereinbefore allowed for that purpose; which said sum, in view of the difficulty of ascertaining the loss which The...