Report A-[F] of Commission on Electric Lighting for the City of New York ...: Submitted to the Board of Estimate and Apportionment. Commission: Cary T. Hutchinson, Chairman ...1906 |
Dentro del libro
Resultados 1-5 de 68
Página 4
... least 6 000 arc lamps will be re- quired , and a connected load equivalent to 250 000 sixteen candle - power incandescent lamps , requir- ing a power plant capacity of 10 000 kilowatts . Our estimates are based on the system given in ...
... least 6 000 arc lamps will be re- quired , and a connected load equivalent to 250 000 sixteen candle - power incandescent lamps , requir- ing a power plant capacity of 10 000 kilowatts . Our estimates are based on the system given in ...
Página 7
... least 10 000 arc lamps in these two boroughs and all the lighting of the public buildings should be done by electricity . I have , therefore , made my principal estimates on a plant to supply 10 000 arc lamps and to do all the lighting ...
... least 10 000 arc lamps in these two boroughs and all the lighting of the public buildings should be done by electricity . I have , therefore , made my principal estimates on a plant to supply 10 000 arc lamps and to do all the lighting ...
Página 9
... least twice as many in Manhattan ; 10 000 is the mini- mum now required , and more would be better . The City now pays for lighting about 600 public buildings and places , such as markets , parks , school houses , police stations ...
... least twice as many in Manhattan ; 10 000 is the mini- mum now required , and more would be better . The City now pays for lighting about 600 public buildings and places , such as markets , parks , school houses , police stations ...
Página 25
... least possible antagonism to such other trades , or the Contractor may be re- quired by the Engineer to have such portion of the work pertaining to other trades done by Contrac- tors operating in such trades . ( a ) The Contractor shall ...
... least possible antagonism to such other trades , or the Contractor may be re- quired by the Engineer to have such portion of the work pertaining to other trades done by Contrac- tors operating in such trades . ( a ) The Contractor shall ...
Página 30
... least thirty days ' continu- ous operation at such ratings and loads as shall be required by the Engineer within the capacity of the machinery , as set forth in these specifications . Each and every part shall receive careful and rigid ...
... least thirty days ' continu- ous operation at such ratings and loads as shall be required by the Engineer within the capacity of the machinery , as set forth in these specifications . Each and every part shall receive careful and rigid ...
Otras ediciones - Ver todas
Report A-[F] of Commission on Electric Lighting for the City of New York ... New York (N y ) Commission on Electric L Sin vista previa disponible - 2015 |
Términos y frases comunes
000 kilowatt-hours 000 kilowatts approved arc lamps arc lights basement floor blow-off boiler feed pumps boiler room Boroughs brass Bronx Brooklyn Brooklyn and Queens bulkhead busbars capacity cast iron cement central station cents City clean coal bunkers COMMISSION ON ELECTRIC Commissioner complete concrete condenser connected construction contract Contractor copper diameter doors drawings duct ELECTRIC LIGHTING Engineer equipment estimate extra heavy face brick feeders feet finished fittings flanges flue furnished galvanized gate valves grade incandescent lighting incandescent service inch intake iron pipe iron pipe size joints load located Manhattan masonry material mortar necessary nickel plated oil switches operating plant plaster plumbing Portland cement Power House pressure public buildings Report Richmond roof sash seawall specifications steam stone storage streets structural steel sub-stations superheater supply surface surge tank thick tile tion total annual cost total cost wall water closet wattmeter wrought iron York
Pasajes populares
Página 33 - ... in case of such discontinuance of the employment of the contractor he shall not be entitled to receive any further payment under this contract until the said work shall be wholly finished, at which time, if the unpaid balance of the amount to be paid under this contract shall exceed the expense Incurred by the owner in finishing the work, such excess shall be paid by the owner to the contractor...
Página 33 - ... written notice to the contractor, to provide any such labor or materials, and to deduct the cost thereof from any money then due or thereafter to become due to the contractor under...
Página 33 - Should the Contractor at any time refuse or neglect to supply a sufficiency of properly skilled workmen, or of materials of the proper quality, or fail in any respect to prosecute the work wIth promptness and diligence, or fail in the performance of any of the agreements herein contained, such refusal, neglect or failure being certified by the Architects, the Owner shall be at liberty, after three days...
Página 10 - DOLLAKS for each and every day the time consumed in said performance and completion may exceed the time hereinbefore allowed for that purpose; which said sum, in view of the difficulty of ascertaining the loss which The...