Report A-[F] of Commission on Electric Lighting for the City of New York ...: Submitted to the Board of Estimate and Apportionment. Commission: Cary T. Hutchinson, Chairman ...1906 |
Dentro del libro
Resultados 1-5 de 83
Página 12
... piping and foundations , ready for operation .... Vertical Engine Plant erected complete , with con- densers , foundations and piping . Electric Generating Plant having a capacity of 10 000 kilowatts , erected complete , including gen ...
... piping and foundations , ready for operation .... Vertical Engine Plant erected complete , with con- densers , foundations and piping . Electric Generating Plant having a capacity of 10 000 kilowatts , erected complete , including gen ...
Página 48
... pipe from the circulating pump and shall be connected to the intake tunnel the full depth of the tunnel . This shall be so arranged as to prevent the suction pipe from obstructing the flow of water in the intake tunnel . ( d ) Both ...
... pipe from the circulating pump and shall be connected to the intake tunnel the full depth of the tunnel . This shall be so arranged as to prevent the suction pipe from obstructing the flow of water in the intake tunnel . ( d ) Both ...
Página 51
... pipes and accessories . ( f ) All carpenter and Kalamein iron work , doors and grilles , with such other matters as are required to complete the super - structure . ( a ) Structural steel to be furnished under these specifications ...
... pipes and accessories . ( f ) All carpenter and Kalamein iron work , doors and grilles , with such other matters as are required to complete the super - structure . ( a ) Structural steel to be furnished under these specifications ...
Página 65
... pipes pass through the ceilings or walls the plaster is to extend close to the thimbles and free from the pipes . Point around all window frames prior to plastering . 59. Roofing . ( g ) Suspended Ceiling . - 65.
... pipes pass through the ceilings or walls the plaster is to extend close to the thimbles and free from the pipes . Point around all window frames prior to plastering . 59. Roofing . ( g ) Suspended Ceiling . - 65.
Página 67
... pipes and to the fire walls . ( b ) Flashings . - All flashings in connection with the tile roofs shall be of 20 oz . copper turned up at the walls , curbs , etc. , worked four inches into the masonry and laid between the third and ...
... pipes and to the fire walls . ( b ) Flashings . - All flashings in connection with the tile roofs shall be of 20 oz . copper turned up at the walls , curbs , etc. , worked four inches into the masonry and laid between the third and ...
Otras ediciones - Ver todas
Report A-[F] of Commission on Electric Lighting for the City of New York ... New York (N y ) Commission on Electric L Sin vista previa disponible - 2015 |
Términos y frases comunes
000 kilowatt-hours 000 kilowatts approved arc lamps arc lights basement floor blow-off boiler feed pumps boiler room Boroughs brass Bronx Brooklyn Brooklyn and Queens bulkhead busbars capacity cast iron cement central station cents City clean coal bunkers COMMISSION ON ELECTRIC Commissioner complete concrete condenser connected construction contract Contractor copper diameter doors drawings duct ELECTRIC LIGHTING Engineer equipment estimate extra heavy face brick feeders feet finished fittings flanges flue furnished galvanized gate valves grade incandescent lighting incandescent service inch intake iron pipe iron pipe size joints load located Manhattan masonry material mortar necessary nickel plated oil switches operating plant plaster plumbing Portland cement Power House pressure public buildings Report Richmond roof sash seawall specifications steam stone storage streets structural steel sub-stations superheater supply surface surge tank thick tile tion total annual cost total cost wall water closet wattmeter wrought iron York
Pasajes populares
Página 33 - ... in case of such discontinuance of the employment of the contractor he shall not be entitled to receive any further payment under this contract until the said work shall be wholly finished, at which time, if the unpaid balance of the amount to be paid under this contract shall exceed the expense Incurred by the owner in finishing the work, such excess shall be paid by the owner to the contractor...
Página 33 - ... written notice to the contractor, to provide any such labor or materials, and to deduct the cost thereof from any money then due or thereafter to become due to the contractor under...
Página 33 - Should the Contractor at any time refuse or neglect to supply a sufficiency of properly skilled workmen, or of materials of the proper quality, or fail in any respect to prosecute the work wIth promptness and diligence, or fail in the performance of any of the agreements herein contained, such refusal, neglect or failure being certified by the Architects, the Owner shall be at liberty, after three days...
Página 10 - DOLLAKS for each and every day the time consumed in said performance and completion may exceed the time hereinbefore allowed for that purpose; which said sum, in view of the difficulty of ascertaining the loss which The...