Report A-[F] of Commission on Electric Lighting for the City of New York ...: Submitted to the Board of Estimate and Apportionment. Commission: Cary T. Hutchinson, Chairman ...1906 |
Dentro del libro
Resultados 1-5 de 40
Página 17
... Protection of Work . 35. Royalties , Patents , etc. 36. Risk and injury to person or property . 37 . 38 . 39 . Guarantees , Liens and Bonds . Certified Check . Certificates . 40. Payments . 41. Understanding Specifications . 42 ...
... Protection of Work . 35. Royalties , Patents , etc. 36. Risk and injury to person or property . 37 . 38 . 39 . Guarantees , Liens and Bonds . Certified Check . Certificates . 40. Payments . 41. Understanding Specifications . 42 ...
Página 26
... protection of property and will light all obstructions in and about the public highways at night and maintain such other danger signs and guards as may be deemed neces- sary by the Engineer . ( a ) At all times , when the work is in ...
... protection of property and will light all obstructions in and about the public highways at night and maintain such other danger signs and guards as may be deemed neces- sary by the Engineer . ( a ) At all times , when the work is in ...
Página 33
... protection and care of his work until fin- ished and turned over to and accepted by the Commissioner . ( a ) The Contractor guarantees to the City the right to use , repair or replace all parts and devices furnished under this contract ...
... protection and care of his work until fin- ished and turned over to and accepted by the Commissioner . ( a ) The Contractor guarantees to the City the right to use , repair or replace all parts and devices furnished under this contract ...
Página 40
... protection , coffer - dams , sheet piling , bracing , etc. , that may be required and shall furnish all pumps and do all pumping necessary to properly install and complete the work in accordance with these specifications . ( a ) Piles ...
... protection , coffer - dams , sheet piling , bracing , etc. , that may be required and shall furnish all pumps and do all pumping necessary to properly install and complete the work in accordance with these specifications . ( a ) Piles ...
Página 42
... ( c ) Lime . - All lime is to be of best quality , thoroughly burned and not slacked when opened for use . Especial care is to be taken in shipment and in storing same on the premises to protect from weather and to keep same dry . All lime ...
... ( c ) Lime . - All lime is to be of best quality , thoroughly burned and not slacked when opened for use . Especial care is to be taken in shipment and in storing same on the premises to protect from weather and to keep same dry . All lime ...
Otras ediciones - Ver todas
Report A-[F] of Commission on Electric Lighting for the City of New York ... New York (N y ) Commission on Electric L Sin vista previa disponible - 2015 |
Términos y frases comunes
000 kilowatt-hours 000 kilowatts approved arc lamps arc lights basement floor blow-off boiler feed pumps boiler room Boroughs brass Bronx Brooklyn Brooklyn and Queens bulkhead busbars capacity cast iron cement central station cents City clean coal bunkers COMMISSION ON ELECTRIC Commissioner complete concrete condenser connected construction contract Contractor copper diameter doors drawings duct ELECTRIC LIGHTING Engineer equipment estimate extra heavy face brick feeders feet finished fittings flanges flue furnished galvanized gate valves grade incandescent lighting incandescent service inch intake iron pipe iron pipe size joints load located Manhattan masonry material mortar necessary nickel plated oil switches operating plant plaster plumbing Portland cement Power House pressure public buildings Report Richmond roof sash seawall specifications steam stone storage streets structural steel sub-stations superheater supply surface surge tank thick tile tion total annual cost total cost wall water closet wattmeter wrought iron York
Pasajes populares
Página 33 - ... in case of such discontinuance of the employment of the contractor he shall not be entitled to receive any further payment under this contract until the said work shall be wholly finished, at which time, if the unpaid balance of the amount to be paid under this contract shall exceed the expense Incurred by the owner in finishing the work, such excess shall be paid by the owner to the contractor...
Página 33 - ... written notice to the contractor, to provide any such labor or materials, and to deduct the cost thereof from any money then due or thereafter to become due to the contractor under...
Página 33 - Should the Contractor at any time refuse or neglect to supply a sufficiency of properly skilled workmen, or of materials of the proper quality, or fail in any respect to prosecute the work wIth promptness and diligence, or fail in the performance of any of the agreements herein contained, such refusal, neglect or failure being certified by the Architects, the Owner shall be at liberty, after three days...
Página 10 - DOLLAKS for each and every day the time consumed in said performance and completion may exceed the time hereinbefore allowed for that purpose; which said sum, in view of the difficulty of ascertaining the loss which The...