Página 45
... surface of concrete which has already set , the surface is to be thoroughly cleaned and washed , and , if required by the engineer , rough- ened with picks in order to provide a firm bond between the two layers . Such surfaces are to be ...
... surface of concrete which has already set , the surface is to be thoroughly cleaned and washed , and , if required by the engineer , rough- ened with picks in order to provide a firm bond between the two layers . Such surfaces are to be ...
Página 47
... surfaces of concrete foundations shall be faced in the following manner : When laying concrete in forms a 2 in . thickness of " Style A " mortar shall be deposited on the outside of the concrete by means of a metal dia- 48. Intake and ...
... surfaces of concrete foundations shall be faced in the following manner : When laying concrete in forms a 2 in . thickness of " Style A " mortar shall be deposited on the outside of the concrete by means of a metal dia- 48. Intake and ...
Página 48
... surface of the ground . ( a ) From the intake openings in the seawall a reinforced concrete intake tunnel shall be con- structed to and under the turbine room basement , being extended to the west end of the turbine room , substantially ...
... surface of the ground . ( a ) From the intake openings in the seawall a reinforced concrete intake tunnel shall be con- structed to and under the turbine room basement , being extended to the west end of the turbine room , substantially ...
Página 53
... surfaces inac- cessible after assembling are to be well painted with a thick coat of genuine red lead mixed with boiled linseed oil before the parts are assembled . ( m ) When the several parts are assembled and accepted by the ...
... surfaces inac- cessible after assembling are to be well painted with a thick coat of genuine red lead mixed with boiled linseed oil before the parts are assembled . ( m ) When the several parts are assembled and accepted by the ...
Página 55
... of the top of the floor strips . Grade the roofs with cinder concrete to pitch the water to the leaders , as shown or directed , and leave the surface ready to receive the finished roof . ( 1 ) Granolithic Floors . In the basement lay 55.
... of the top of the floor strips . Grade the roofs with cinder concrete to pitch the water to the leaders , as shown or directed , and leave the surface ready to receive the finished roof . ( 1 ) Granolithic Floors . In the basement lay 55.
Otras ediciones - Ver todas
Report A-[F] of Commission on Electric Lighting for the City of New York ... New York (N y ) Commission on Electric L Sin vista previa disponible - 2015 |
Términos y frases comunes
000 kilowatt-hours 000 kilowatts approved arc lamps arc lights basement floor blow-off boiler feed pumps boiler room Boroughs brass Bronx Brooklyn Brooklyn and Queens bulkhead busbars capacity cast iron cement central station cents City clean coal bunkers COMMISSION ON ELECTRIC Commissioner complete concrete condenser connected construction contract Contractor copper diameter doors drawings duct ELECTRIC LIGHTING Engineer equipment estimate extra heavy face brick feeders feet finished fittings flanges flue furnished galvanized gate valves grade incandescent lighting incandescent service inch intake iron pipe iron pipe size joints load located Manhattan masonry material mortar necessary nickel plated oil switches operating plant plaster plumbing Portland cement Power House pressure public buildings Report Richmond roof sash seawall specifications steam stone storage streets structural steel sub-stations superheater supply surface surge tank thick tile tion total annual cost total cost wall water closet wattmeter wrought iron York
Pasajes populares
Página 33 - ... in case of such discontinuance of the employment of the contractor he shall not be entitled to receive any further payment under this contract until the said work shall be wholly finished, at which time, if the unpaid balance of the amount to be paid under this contract shall exceed the expense Incurred by the owner in finishing the work, such excess shall be paid by the owner to the contractor...
Página 33 - ... written notice to the contractor, to provide any such labor or materials, and to deduct the cost thereof from any money then due or thereafter to become due to the contractor under...
Página 33 - Should the Contractor at any time refuse or neglect to supply a sufficiency of properly skilled workmen, or of materials of the proper quality, or fail in any respect to prosecute the work wIth promptness and diligence, or fail in the performance of any of the agreements herein contained, such refusal, neglect or failure being certified by the Architects, the Owner shall be at liberty, after three days...
Página 10 - DOLLAKS for each and every day the time consumed in said performance and completion may exceed the time hereinbefore allowed for that purpose; which said sum, in view of the difficulty of ascertaining the loss which The...