Report A-[F] of Commission on Electric Lighting for the City of New York ...: Submitted to the Board of Estimate and Apportionment. Commission: Cary T. Hutchinson, Chairman ...1906 |
Dentro del libro
Página 22
... he shall not assign , transfer , convey , sublet or otherwise dispose of this contract , or his right , title , or interest in or to the same or any part hereof without the previ- ous consent in writing of the Commisisoner indorsed ...
... he shall not assign , transfer , convey , sublet or otherwise dispose of this contract , or his right , title , or interest in or to the same or any part hereof without the previ- ous consent in writing of the Commisisoner indorsed ...
Otras ediciones - Ver todas
Report A-[F] of Commission on Electric Lighting for the City of New York ... New York (N y ) Commission on Electric L Sin vista previa disponible - 2015 |
Términos y frases comunes
000 kilowatt-hours 000 kilowatts approved arc lamps arc lights basement floor blow-off boiler feed pumps boiler room Boroughs brass Bronx Brooklyn Brooklyn and Queens bulkhead busbars capacity cast iron cement central station cents City clean coal bunkers COMMISSION ON ELECTRIC Commissioner complete concrete condenser connected construction contract Contractor copper diameter discharge tunnel doors drawings duct ELECTRIC LIGHTING Engineer equipment estimate extra heavy face brick feeders feet finished fittings flanges flue furnished galvanized gate valves grade incandescent lighting incandescent service inch intake iron pipe iron pipe size joints load located Manhattan masonry material mortar necessary nickel plated oil switches operating plant plaster plumbing Portland cement Power House pressure public buildings roof sash seawall specifications steam stone storage streets structural steel sub-stations superheater supply surface surge tank thick tile tion total annual cost total cost wall water closet wattmeter wrought iron York
Pasajes populares
Página 1 - President of , the corporation described in and which executed the foregoing instrument; that he knows the seal of said corporation; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the Board of Directors of said Corporation and that he signed his name thereto by like order.
Página 33 - ... in case of such discontinuance of the employment of the contractor he shall not be entitled to receive any further payment under this contract until the said work shall be wholly finished, at which time, if the unpaid balance of the amount to be paid under this contract shall exceed the expense Incurred by the owner in finishing the work, such excess shall be paid by the owner to the contractor...
Página 4 - State of New York, ss. : On this day of , 1906, before me personally came to me known, who, being duly sworn, did depose and say that he resides in The City of...
Página 2 - Commonalty, or their certain attorney, successors, or assigns ; for which payment, well and truly to be made, we, and each of us, do bind ourselves, and each of our heirs, executors, and administrators, jointly and severally, firmly by these presents.
Página 1 - STATE OF NEW YORK < COUNTY OF SS ' On this day of ,196 before me, the subscriber, personally came to me personally known and known to me to be the same person described in and who executed the foregoing Instrument and he acknowledged to me that he executed the same.
Página 4 - On this.... day of July, AD, 1917, personally appeared before me, a Notary Public, in and for the County of State of Texas, John Jones, known to me to be the person described in and who executed the foregoing instrument and who acknowledged to me that he executed the same freely and voluntarily and for the uses and purposes therein mentioned.
Página 33 - ... written notice to the contractor, to provide any such labor or materials, and to deduct the cost thereof from any money then due or thereafter to become due to the contractor under...
Página 33 - Should the Contractor at any time refuse or neglect to supply a sufficiency of properly skilled workmen, or of materials of the proper quality, or fail in any respect to prosecute the work wIth promptness and diligence, or fail in the performance of any of the agreements herein contained, such refusal, neglect or failure being certified by the Architects, the Owner shall be at liberty, after three days...