Página 35
... breakwater was built to a total length of 6,970 feet , a height of 10 feet ... main work may demonstrate the necessity or otherwise of such a structure for ... breakwater during the year . The harbor slopes of the breakwater were slightly ...
... breakwater was built to a total length of 6,970 feet , a height of 10 feet ... main work may demonstrate the necessity or otherwise of such a structure for ... breakwater during the year . The harbor slopes of the breakwater were slightly ...
Página 40
... breakwater on the east and the adjacent shore on the south and west , but an ... break- water ( $ 24,000 ) , and a little dredging ( $ 5,000 ) along the ... main inner harbor to a depth of 10 feet , at an estimated cost of $ 83,985 ...
... breakwater on the east and the adjacent shore on the south and west , but an ... break- water ( $ 24,000 ) , and a little dredging ( $ 5,000 ) along the ... main inner harbor to a depth of 10 feet , at an estimated cost of $ 83,985 ...
Página 41
... main breakwater and stop sand leaks through certain portions of it , repair and strengthen the west breakwater of the enlarged inner harbor , dredge the enlarged inner harbor to a depth of 10 feet at mean low water , and remove the crib ...
... main breakwater and stop sand leaks through certain portions of it , repair and strengthen the west breakwater of the enlarged inner harbor , dredge the enlarged inner harbor to a depth of 10 feet at mean low water , and remove the crib ...
Página 29
... breakwater to 9 feet above high water , the present height being 6 feet , and the postpone- ment of the construction of the detached eastern breakwater until after the completion of the main work may demonstrate the necessity or other ...
... breakwater to 9 feet above high water , the present height being 6 feet , and the postpone- ment of the construction of the detached eastern breakwater until after the completion of the main work may demonstrate the necessity or other ...
Página 33
... breakwater to proper height , stopping sand leaks between certain points , and dredging the main inner harbor to a depth of 10 feet , at an estimated cost of $ 83,985 . A plan of the works may be found on page 612 , Annual Report of the ...
... breakwater to proper height , stopping sand leaks between certain points , and dredging the main inner harbor to a depth of 10 feet , at an estimated cost of $ 83,985 . A plan of the works may be found on page 612 , Annual Report of the ...
Otras ediciones - Ver todas
Términos y frases comunes
00 August 00 July 00 June 00 March 25 feet accompanying plans act of June amount expended Amounts Appropriated angle August 18 balance unexpended Block Island breakwater channel Chief of Engineers city of Providence commenced commerce arriving COMMERCIAL STATISTICS Company completed Corps of Engineers Cove cubic yards dredging easterly ending June 30 entrance estimated existing project expended during fiscal feet deep feet depth feet wide fiscal year ending harbor act harbor commissioners harbor line harbor of refuge improvement inner harbor July 13 June 13 June 30 last named line latitude south longitude east main breakwater mean low water MONEY STATEMENT Narragansett Bay northerly Number obstruction Operations Contemplated past fiscal Pawtucket Pawtucket River Pleasure boats Point Judith point marked Point street bridge Providence Harbor Providence river removal Rhode Island river and harbor rock Sakonnet River Salt Pond Seekonk river September 19 shoal shore survey thence running south Total westerly width