South Milwaukee to Portage (via Horicon), 98 miles, and North Milwaukee to Schwarzburg, 6.3 miles. SCHEDULE 1. Right of Way. 103 miles through unplatted lands $257,500 SCHEDULE 2. Depot Grounds. NORTH MILWAUKEE. 29 lots in blocks 30, 33, 40 and 41, at $6,000..... $174,000 5 lots in block 30, $12,500, 5 lots in block 21, $9,500 20,000 4,000 $8,000... ....... 10,500 14 acres shop grounds. 28,000 Hartford $25,000 Rubicon 5,000 Bridging... 24,800 Stone and wood culverts, pile abutments, road bridges, cattle guards, highway crossings, road mile posts, etc.. SCHEDULE 9. Chairs, Spikes, Fish Bars and Switches. 118.5 miles chair spikes, etc., at $643 per mile.... $76, 195 13, 490 1,200 $90,885 $57,500 $24,000 $2,000 $7,700 $242,100 $18, 600 $92,000 Schwarzburg 500 Granville Richfield Schleissingerville 2,500 Hartford.. Rubicon 1,200 Woodland Iron Ridge Minn. Junction Horicon Junction. Rolling Prairie 1,500 1,000 Beaver Dam ... Fox Lake Junction.. Randolph... 2,500 Cambria Pardeeville Totals... $102, 400 $85,000 $3,600 $40,100 $249, 100 $20, 900 $93,000 Engine houses, as per sched...... [No. 2. 5,200 ..[No. 2. 3,200 Wood-sheds, water-stations and miscellaneous, as per schedule. 12,700 Fencing.. Elevators, as per schedule... [No. 1. ]...... Total cash value of line unequipped.... 15,000 95, 800 25,500 6, 100 31, 600 $1,057,738 SCHEDULE 2.-Depot Grounds. Omro and Winneconne.. $17,000 SCHEDULE 3.-Grading. Earthwork, 552,500 yards, at 30c Additional for 170,000 yards rocky material, at 30c... SCHEDULES 4 AND 5.-Masonry and Bridging. Culverts, bridges, cattle guards, highway crossings, road signs, mile posts, etc SCHEDULES 4 AND 5.-Masonry and Bridging. Culverts, bridges, cattle guards, road crossings, signs and posts. SCHEDULES. STATIONS. Line from Horicon to Berlin. $165,750 51,000 $216, 750 $51,000 $29,450 3,230 $32, 680 $55,575 10,500 $66,075 $17,130 Iron rails.... [No., miles, 15.2; lbs. wt. per yd. 60]. 114,608 10,723 Laying track. 21,280 Total cash valuation of superstructure 166, 675 Passenger stations and fixtures, as per schedule,. Freight stations and fixtures, as per schedule.... 12,400 [No., 1] 2,000 Turn tables, as per schedule 1,600 Wood sheds and water stations, and miscellaneous, as per schedule [No., 2] 2,800 Fencing. .[No., miles 13] 10,400 Elevators, as per schedule 10,000 Engineering expenses before and during construc tion Total cash valuation of buildings of every sort, fencing, etc. Salaries of officers and agents essential during construction 39,200 7,000 2,000 Total cost of engineering and official manage ment during construction... 9,000 Total cash value of line unequipped......... 343,080 |