South Milwaukee to Portage (via Horicon), 98 miles, and North Milwaukee to Schwarzburg, 6.3 miles.

SCHEDULE 1. Right of Way.

103 miles through unplatted lands

$257,500

SCHEDULE 2. Depot Grounds.

NORTH MILWAUKEE.

29 lots in blocks 30, 33, 40 and 41, at $6,000.....

$174,000

5 lots in block 30, $12,500, 5 lots in block 21, $9,500
8 lots in blocks 1 and 13, at $500
Part of blocks 33, 47 and 48, at $2,500, 1,750 x 100 ft.,

20,000

4,000

$8,000...

.......

10,500

14 acres shop grounds.

28,000

Hartford

$25,000

Rubicon

5,000

[merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Bridging...

24,800

Stone and wood culverts, pile abutments, road bridges, cattle guards, highway crossings, road mile posts, etc..

[blocks in formation]

SCHEDULE 9. Chairs, Spikes, Fish Bars and Switches.

118.5 miles chair spikes, etc., at $643 per mile....
Extra cost of switches for 142 miles side track, at $950...
3 railroad crossings.

$76, 195 13, 490 1,200

$90,885

[blocks in formation]

$57,500 $24,000 $2,000 $7,700 $242,100 $18, 600 $92,000

Schwarzburg

500

Granville

[blocks in formation]

Richfield

[blocks in formation]

Schleissingerville

2,500

Hartford..

[blocks in formation]

Rubicon

1,200

Woodland

Iron Ridge

Minn. Junction

[blocks in formation]

Horicon Junction.

[blocks in formation]

Rolling Prairie

1,500

1,000

Beaver Dam ...

[blocks in formation]

Fox Lake Junction..

[blocks in formation]

Randolph...

2,500

Cambria

[blocks in formation]

Pardeeville

[blocks in formation]

Totals...

$102, 400 $85,000 $3,600 $40,100 $249, 100 $20, 900 $93,000

[blocks in formation]

Engine houses, as per sched...... [No. 2.
Turn tables, as per sched...

5,200

..[No. 2.

3,200

Wood-sheds, water-stations and miscellaneous, as

per schedule.

12,700

Fencing..

Elevators, as per schedule... [No. 1. ]......
Total cash val. of buildings, fencing, etc.
Engineering expenses before and during construc'n
Salaries of officers and agents essential during con.
Total cost of eng. and official man. during con.

Total cash value of line unequipped....

[blocks in formation]

15,000

95, 800

25,500

6, 100

31, 600 $1,057,738

[blocks in formation]

SCHEDULE 2.-Depot Grounds.

Omro and Winneconne..

$17,000

SCHEDULE 3.-Grading.

Earthwork, 552,500 yards, at 30c

Additional for 170,000 yards rocky material, at 30c...

SCHEDULES 4 AND 5.-Masonry and Bridging.

Culverts, bridges, cattle guards, highway crossings, road signs, mile posts, etc

[blocks in formation]

SCHEDULES 4 AND 5.-Masonry and Bridging.

Culverts, bridges, cattle guards, road crossings, signs and posts.

SCHEDULES.

STATIONS.

Line from Horicon to Berlin.

$165,750

51,000

$216, 750

$51,000

$29,450

3,230

$32, 680

$55,575

10,500

$66,075

$17,130

[blocks in formation]
[blocks in formation]
[blocks in formation]

Iron rails.... [No., miles, 15.2; lbs. wt. per yd. 60].
Chairs, spikes, fish-bars, etc

114,608

10,723

Laying track.

21,280

Total cash valuation of superstructure

166, 675

Passenger stations and fixtures, as per schedule,.

Freight stations and fixtures, as per schedule....
Engine houses, as per schedule

12,400

[No., 1]

2,000

Turn tables, as per schedule

1,600

Wood sheds and water stations, and miscellaneous,

as per schedule

[No., 2]

2,800

Fencing.

.[No., miles 13]

10,400

Elevators, as per schedule

10,000

Engineering expenses before and during construc

tion

Total cash valuation of buildings of every sort, fencing, etc.

Salaries of officers and agents essential during construction

39,200

7,000

2,000

Total cost of engineering and official manage ment during construction...

9,000

Total cash value of line unequipped.........

343,080