Standard Specifications for Construction of AirportsOffice of Airports, 1948 - 588 páginas |
Dentro del libro
Resultados 1-5 de 100
Página 2
... necessary for the proper construction and acceptable com- pletion of the work . 10-16 INSPECTOR . An authorized representative of the engi- neer assigned to make all necessary inspections of the work performed or being performed , or of ...
... necessary for the proper construction and acceptable com- pletion of the work . 10-16 INSPECTOR . An authorized representative of the engi- neer assigned to make all necessary inspections of the work performed or being performed , or of ...
Página 12
... necessary to complete the project in a satisfactory and acceptable manner , as pro- vided in the plans , proposal , and contract . He shall furnish , unless otherwise provided in the specifications , special provisions , or contract ...
... necessary to complete the project in a satisfactory and acceptable manner , as pro- vided in the plans , proposal , and contract . He shall furnish , unless otherwise provided in the specifications , special provisions , or contract ...
Página 13
... necessary to complete the work . 40-04 OMITTED ITEMS . The engineer may , in writing , or- der omitted from the work any item other than major items found un- necessary to the project and such omission shall not be a waiver of any ...
... necessary to complete the work . 40-04 OMITTED ITEMS . The engineer may , in writing , or- der omitted from the work any item other than major items found un- necessary to the project and such omission shall not be a waiver of any ...
Página 21
... necessary to meet with above requirements when Federal funds are used , but such inspection will in no sense make the Federal Government a party to this contract and will in no way interfere with the rights of either party hereunder ...
... necessary to meet with above requirements when Federal funds are used , but such inspection will in no sense make the Federal Government a party to this contract and will in no way interfere with the rights of either party hereunder ...
Página 23
... necessary repairs and renewals on any section of the runway , so opened , due to defective material or work , to natural causes other than ordinary wear and tear , or to the operations of the contractor , shall be performed by and at ...
... necessary repairs and renewals on any section of the runway , so opened , due to defective material or work , to natural causes other than ordinary wear and tear , or to the operations of the contractor , shall be performed by and at ...
Contenido
268 | |
280 | |
288 | |
315 | |
318 | |
322 | |
327 | |
332 | |
64 | |
71 | |
82 | |
89 | |
108 | |
119 | |
125 | |
131 | |
141 | |
148 | |
156 | |
162 | |
169 | |
176 | |
184 | |
197 | |
208 | |
216 | |
224 | |
233 | |
248 | |
255 | |
341 | |
353 | |
357 | |
363 | |
369 | |
375 | |
381 | |
383 | |
390 | |
397 | |
401 | |
412 | |
421 | |
435 | |
443 | |
455 | |
469 | |
544 | |
570 | |
578 | |
583 | |
Otras ediciones - Ver todas
Términos y frases comunes
A. A. S. H. O. Method A. A. S. H. O. Specification airport amount applied approved areas asphalt cement backfill base course base material beacon bituminous material cable coarse aggregate coat compacted concrete condition conform constitute full compensation contract unit price cubic yard density depth duct emulsified asphalt engineer equipment excavation Federal Specification feet fertilizer filler finished foot measurement furnishing and installing gradation inches incidentals necessary item shall consist joints layer lime liquid limit live seed measured mesh sieve mixer mixing mixture moisture mortar mulch necessary to complete operations paid paint pavement payment shall constitute percent pipe placed plans plant plasticity index Portland cement price and payment quantity removed requirements of A. A. S. H. O. roller rolling runway sample shown soil soil cement special provisions specific gravity spread square yard steel subgrade temperature thickness tion topsoil trench underlying course uniform weight width windrow wire
Pasajes populares
Página 1 - Airport" means any area of land or water which is used, or intended for use, for the landing and take-off of aircraft, and any appurtenant areas which are used, or intended for use, for airport buildings or other airport facilities or right-of-ways, together with all airport buildings and facilities located thereon.
Página 30 - ... for all expenses incurred in consequence of the suspension or discontinuance of the work as herein specified...
Página 314 - The yardage measured as provided above shall be paid for at the contract unit price per square yard bid for plain or reinforced Portland cement concrete pavement...
Página 12 - The intent of the contract is to prescribe a complete work or improvement which the contractor undertakes to do, in full compliance with the plans, specifications, special provisions, proposal, and contract.
Página 6 - The owner does not expressly or by implication agree that the actual quantities involved will correspond exactly therewith; nor shall the bidder plead misunderstanding or deception because of such estimate of quantities, or of the character, location, or other conditions pertaining to the work.
Página 25 - The engineer shall have authority to suspend the work wholly or in part for such period or periods as he may deem necessary, due to unsuitable weather or such other conditions as are considered unfavorable for the prosecution of the work...
Página 239 - ... 10. Control of Mixing Time. — The plant shall be equipped with positive means to govern the time of mixing and to maintain it constant unless changed by order of the Engineer. The time of mixing shall be considered as the interval between the time the asphalt is spread on the aggregate and the time the same aggregate leaves the mixing unit.
Página 232 - ... materials, and for all labor, equipment, tools, and incidentals necessary to complete the item.
Página 102 - ... when directed by the engineer each load shall be covered with canvas or other suitable material of sufficient size to protect it from weather conditions.
Página 277 - ... occurring as a result of reversing the direction of the roller, or from any other cause, shall at once be corrected by the use of rakes and of fresh mixture where required. Rolling shall proceed continuously until all roller marks are eliminated and no further compression is possible.