Standard Specifications for Construction of AirportsOffice of Airports, 1948 - 588 páginas |
Dentro del libro
Resultados 1-5 de 100
Página
... Proposal Requirements and Conditions . 30 Award and Execution of Contract .. 6 10 40 Scope of Work . 12 50 Control of Work and Materials . 15 60 Legal Relations and Responsibilities to Public . 20 70 Prosecution and Progress . 24 80 ...
... Proposal Requirements and Conditions . 30 Award and Execution of Contract .. 6 10 40 Scope of Work . 12 50 Control of Work and Materials . 15 60 Legal Relations and Responsibilities to Public . 20 70 Prosecution and Progress . 24 80 ...
Página 1
... proposal for the work contemplated . 10-08 BUILDING AREA . Building area is that part of an air- port which is used , considered , or intended to be used for airport buildings or other airport facilities or rights - of - way together ...
... proposal for the work contemplated . 10-08 BUILDING AREA . Building area is that part of an air- port which is used , considered , or intended to be used for airport buildings or other airport facilities or rights - of - way together ...
Página 3
... PROPOSAL . The written offer of the bidder , when sub- mitted on the approved proposal form , to perform the contemplated work and furnish the necessary materials in accordance with the provisions of the plans and these specifications ...
... PROPOSAL . The written offer of the bidder , when sub- mitted on the approved proposal form , to perform the contemplated work and furnish the necessary materials in accordance with the provisions of the plans and these specifications ...
Página 4
... proposal and agreement executed by the contractor and by the owner , with the consent of the contractor's surety covering work not included in the plans and proposal or as specified in paragraph 40-03 , which is neces- sary to the ...
... proposal and agreement executed by the contractor and by the owner , with the consent of the contractor's surety covering work not included in the plans and proposal or as specified in paragraph 40-03 , which is neces- sary to the ...
Página 5
... - posal and the contract , shall be given as definite number of working days , and shall be considered an essential part of the contract . SECTION 20 PROPOSAL REQUIREMENTS AND CONDITIONS 20-01 NOTICE TO CONTRACTORS DEFINITION OF TERMS 5.
... - posal and the contract , shall be given as definite number of working days , and shall be considered an essential part of the contract . SECTION 20 PROPOSAL REQUIREMENTS AND CONDITIONS 20-01 NOTICE TO CONTRACTORS DEFINITION OF TERMS 5.
Contenido
268 | |
280 | |
288 | |
315 | |
318 | |
322 | |
327 | |
332 | |
64 | |
71 | |
82 | |
89 | |
108 | |
119 | |
125 | |
131 | |
141 | |
148 | |
156 | |
162 | |
169 | |
176 | |
184 | |
197 | |
208 | |
216 | |
224 | |
233 | |
248 | |
255 | |
341 | |
353 | |
357 | |
363 | |
369 | |
375 | |
381 | |
383 | |
390 | |
397 | |
401 | |
412 | |
421 | |
435 | |
443 | |
455 | |
469 | |
544 | |
570 | |
578 | |
583 | |
Otras ediciones - Ver todas
Términos y frases comunes
A. A. S. H. O. Method A. A. S. H. O. Specification airport amount applied approved areas asphalt cement backfill base course base material beacon bituminous material cable coarse aggregate coat compacted concrete condition conform constitute full compensation contract unit price cubic yard density depth duct emulsified asphalt engineer equipment excavation Federal Specification feet fertilizer filler finished foot measurement furnishing and installing gradation inches incidentals necessary item shall consist joints layer lime liquid limit live seed measured mesh sieve mixer mixing mixture moisture mortar mulch necessary to complete operations paid paint pavement payment shall constitute percent pipe placed plans plant plasticity index Portland cement price and payment quantity removed requirements of A. A. S. H. O. roller rolling runway sample shown soil soil cement special provisions specific gravity spread square yard steel subgrade temperature thickness tion topsoil trench underlying course uniform weight width windrow wire
Pasajes populares
Página 1 - Airport" means any area of land or water which is used, or intended for use, for the landing and take-off of aircraft, and any appurtenant areas which are used, or intended for use, for airport buildings or other airport facilities or right-of-ways, together with all airport buildings and facilities located thereon.
Página 30 - ... for all expenses incurred in consequence of the suspension or discontinuance of the work as herein specified...
Página 314 - The yardage measured as provided above shall be paid for at the contract unit price per square yard bid for plain or reinforced Portland cement concrete pavement...
Página 12 - The intent of the contract is to prescribe a complete work or improvement which the contractor undertakes to do, in full compliance with the plans, specifications, special provisions, proposal, and contract.
Página 6 - The owner does not expressly or by implication agree that the actual quantities involved will correspond exactly therewith; nor shall the bidder plead misunderstanding or deception because of such estimate of quantities, or of the character, location, or other conditions pertaining to the work.
Página 25 - The engineer shall have authority to suspend the work wholly or in part for such period or periods as he may deem necessary, due to unsuitable weather or such other conditions as are considered unfavorable for the prosecution of the work...
Página 239 - ... 10. Control of Mixing Time. — The plant shall be equipped with positive means to govern the time of mixing and to maintain it constant unless changed by order of the Engineer. The time of mixing shall be considered as the interval between the time the asphalt is spread on the aggregate and the time the same aggregate leaves the mixing unit.
Página 232 - ... materials, and for all labor, equipment, tools, and incidentals necessary to complete the item.
Página 102 - ... when directed by the engineer each load shall be covered with canvas or other suitable material of sufficient size to protect it from weather conditions.
Página 277 - ... occurring as a result of reversing the direction of the roller, or from any other cause, shall at once be corrected by the use of rakes and of fresh mixture where required. Rolling shall proceed continuously until all roller marks are eliminated and no further compression is possible.