Standard Specifications for Construction of AirportsOffice of Airports, 1948 - 588 páginas |
Dentro del libro
Resultados 1-5 de 24
Página 42
... seed and fertilizers shall be done in accordance with the latest " Rules and Regulations Under the Federal Seed Act , " in effect as of the date of the purchase order , and using approved methods in de- termining compliance with ...
... seed and fertilizers shall be done in accordance with the latest " Rules and Regulations Under the Federal Seed Act , " in effect as of the date of the purchase order , and using approved methods in de- termining compliance with ...
Página 44
... seed of species which would volunteer and be detrimental to proposed overseeding , or to surrounding farm land , will not be acceptable . Straw or other mulch material which is fresh and excessively brittle , or which is in such an ...
... seed of species which would volunteer and be detrimental to proposed overseeding , or to surrounding farm land , will not be acceptable . Straw or other mulch material which is fresh and excessively brittle , or which is in such an ...
Página 208
... seed bed of suit- able soil or combination of soil and aggregate , constructed on a pre- pared subgrade or a previously constructed underlying course in accordance with these specifications and in conformity with the di- mensions and ...
... seed bed of suit- able soil or combination of soil and aggregate , constructed on a pre- pared subgrade or a previously constructed underlying course in accordance with these specifications and in conformity with the di- mensions and ...
Página 213
... seed bed for the establishment of the turf . If topsoil is to be placed , the surface of the base course shall be loosened slightly as directed by the engineer . If seeding is to be done without topsoiling , the surface of the base ...
... seed bed for the establishment of the turf . If topsoil is to be placed , the surface of the base course shall be loosened slightly as directed by the engineer . If seeding is to be done without topsoiling , the surface of the base ...
Página 215
... seed ; for compacting ; for repairing and maintenance ; and for all labor , equipment , tools , and incidentals necessary to complete the work . The units of watering for planting , measured as determined above , shall be paid for at ...
... seed ; for compacting ; for repairing and maintenance ; and for all labor , equipment , tools , and incidentals necessary to complete the work . The units of watering for planting , measured as determined above , shall be paid for at ...
Contenido
268 | |
280 | |
288 | |
315 | |
318 | |
322 | |
327 | |
332 | |
71 | |
77 | |
89 | |
108 | |
119 | |
125 | |
131 | |
141 | |
148 | |
156 | |
162 | |
169 | |
176 | |
184 | |
197 | |
208 | |
216 | |
224 | |
233 | |
248 | |
255 | |
341 | |
353 | |
357 | |
363 | |
369 | |
375 | |
381 | |
383 | |
390 | |
397 | |
401 | |
412 | |
421 | |
435 | |
443 | |
455 | |
469 | |
540 | |
570 | |
578 | |
Otras ediciones - Ver todas
Términos y frases comunes
A. A. S. H. O. Method A. A. S. H. O. Specification airport amount applied approved areas asphalt cement backfill base course base material bituminous material cable coarse aggregate coat compacted concrete condition conform constitute full compensation contract unit price cubic foot cubic yard density depth duct engineer equipment excavation Federal Specification fence filler finished foot measurement furnishing and installing gradation grade inches incidentals necessary item shall consist joints layer lime liquid limit live seed measured mesh sieve mixer mixing mixture moisture mortar mulch necessary to complete operations paid paint pavement payment shall constitute percent pipe placed plans plant plasticity index Portland cement price and payment quantity removed requirements of A. A. S. H. O. roller rolling runway sample shown soil special provisions specific gravity spread square yard steel subbase subgrade surface temperature thickness tion topsoil trench underlying course uniform weight width windrow wire
Pasajes populares
Página 1 - Airport" means any area of land or water which is used, or intended for use, for the landing and take-off of aircraft, and any appurtenant areas which are used, or intended for use, for airport buildings or other airport facilities or right-of-ways, together with all airport buildings and facilities located thereon.
Página 30 - ... for all expenses incurred in consequence of the suspension or discontinuance of the work as herein specified...
Página 314 - The yardage measured as provided above shall be paid for at the contract unit price per square yard bid for plain or reinforced Portland cement concrete pavement...
Página 12 - The intent of the contract is to prescribe a complete work or improvement which the contractor undertakes to do, in full compliance with the plans, specifications, special provisions, proposal, and contract.
Página 6 - The owner does not expressly or by implication agree that the actual quantities involved will correspond exactly therewith; nor shall the bidder plead misunderstanding or deception because of such estimate of quantities, or of the character, location, or other conditions pertaining to the work.
Página 25 - The engineer shall have authority to suspend the work wholly or in part for such period or periods as he may deem necessary, due to unsuitable weather or such other conditions as are considered unfavorable for the prosecution of the work...
Página 239 - ... 10. Control of Mixing Time. — The plant shall be equipped with positive means to govern the time of mixing and to maintain it constant unless changed by order of the Engineer. The time of mixing shall be considered as the interval between the time the asphalt is spread on the aggregate and the time the same aggregate leaves the mixing unit.
Página 232 - ... materials, and for all labor, equipment, tools, and incidentals necessary to complete the item.
Página 102 - ... when directed by the engineer each load shall be covered with canvas or other suitable material of sufficient size to protect it from weather conditions.
Página 277 - ... occurring as a result of reversing the direction of the roller, or from any other cause, shall at once be corrected by the use of rakes and of fresh mixture where required. Rolling shall proceed continuously until all roller marks are eliminated and no further compression is possible.