Imágenes de páginas
PDF
EPUB

HAFERKORN, HENRY E., Librarian, Engineer School.

Selected Articles of Engineering Interest 145-161, 337-351,

517-527, 673-685

HALE, IRVING, Brigadier General, United States Volunteers.
Discussion

494-495

HANSEN, PAUL, M. Am. Soc. C. E.

Discussion

HARRINGTON, D. A., Consulting and Supervising Engineer.

Underground Conduit Construction...

HARTS, W. W., Major, Corps of Engineers.

Discussion

646

207-230

330-331

Harbor Improvement on the Pacific Coast of the United States. 618-641

HASKINS, CARYL D.

A Civilian's Suggestions for a Technical Reserve for the Army 477-489
Discussion

489-508

[blocks in formation]

KELLOGG, J. W., Manager Marine Sales Department, General Electric
Company.

Discussion

68-69

KUHN, J. E., Colonel, Corps of Engineers.

Discussion

495-497

LANGFITT, W. C., Lieutenant-Colonel, Corps of Engineers.

[blocks in formation]

Rebuilding Lock Gates, Milan Section of Illinois and Mississippi
Canal, During Seasons of 1910-1911...

392-395

MCQUIGG, J. R., Major, Ohio National Guard.

The Work of the Corps of Engineers, Ohio National Guard______ 302-312

MEIGS, M., United States Civil Engineer.

An Experiment in Wood Preservation
OAKES, J. C., Major, Corps of Engineers.
Discussion

231-235

318-324

[blocks in formation]

The Chesapeake and Delaware Canal in the Civil War..

267-269

ROBERTS, H. L.

Rock Dredging at Carr Shoals, Oconee River, Georgia__

509-512

[blocks in formation]

ROSE, W. H., Lieutenant (now Captain), Corps of Engineers.

Field Searchlights

A New Portable Searchlight Tower

1-22

336

Railway Transportation Required for a Pioneer Battalion, U. S. A. 613-617
SABIN, LOUIS C., Assistant Engineer.

Fluctuations of Water Level in a Canal Caused by the Filling of
Locks

201-206

SCOTT, CHARLES F., Consulting Engineer, Westinghouse Electric Co.
Government Specifications for Electrical Apparatus.

54-66

SEWELL, JOHN S., Late Major, Corps of Engineers.

Discussion

SKEY, F. E. G.

497-499

89-116, 276-301

The Final Struggle for 203-Meter Hill at Port Arthur
SMRCEK, ANTONIN, Engineer, Professor at the I. R. Bohemian Tech-
nical High School in Brunn.

Relative Advantages of Locks, Lifts, and Inclines_

117-140

STEESE, JAMES G., Lieutenant, Corps of Engineers.

Comparative Tests of Wye and Dumpy Levels

75-76

STEINMETZ, C. P., Consulting Engineer, General Electric Company.
Discussion

645

STURDEVANT, C. L., Lieutenant, Corps of Engineers.

[blocks in formation]
[blocks in formation]

A-Frame Movable Top to Provide Increased Depths Above Fixed

[blocks in formation]

Earth Excavation, Comparative Methods of, Coll ert Shoals Canal 558-566

Fluctuations of Water Level in a Canal Caused by Filling of Locks 201-206

Chesapeake and Delaware Canal in the Civil War, The

267-269

[blocks in formation]

A-Frame Movable Top to Provide Increased Depths Above Fixed
Dams, An

315-318

Dam No. 10, Monongahela River, Damaged by Burning Oil.

74

Delafield, Richard

416-417

Derrick, with Adjustable Boom, A Simple_

474-476

Discharge of Unpurified Sewage into the Hudson River near Yonkers,
The

396-412

Dredges and Dredging:

Dredging Appliances and Steam Dredges, Early

413-415

Rock Dredging at Carr Shoals, Oconee River, Georgia_

509-512

Earth Excavation, Comparative Methods of, Colbert Shoals Canal__. 558-566
Editorial Notes
163-166, 353-362, 529-534, 687-690

Electrical Apparatus, Government Specifications for

54-74

Filing and Indexing Professional Literature, A System for‒‒‒‒‒‒ 552-557
Final Struggle for 203-Meter Hill at Port Arthur, The_

Forms at Lock No. 21, Cumberland River, Cost of

Fuel Oil v. Coal__

Gratiot, Charles

Harbors:

89-116, 276-301

601-612

270-275

80-82

Harbor Improvements on the Pacific Coast of the United States 618-641

[blocks in formation]

Cost of Forms at Lock No. 21, Cumberland River
Elements Affecting Lock Construction on Canalized Rivers Having
Fixed Dams

601-612

567-590

Fluctuations of Water Level in a Canal Caused by Filling of Locks 201-206
Locks and Movable Dams of the Ohio River

535-551

Rebuilding Lock Gates, Milan Section of Illinois and Mississippi
Canal During Seasons of 1910-1911---

392-395

[blocks in formation]

Ohio National Guard, The Work of the Corps of Engineers

302-312

[blocks in formation]

A-Frame Movable Top to Provide Increased Depths Above Fixed
Dams

315-335

Brussels Ship Canal, The_-

436-455

Early Dredging Appliances and Steam Dredges

413-415

Elements Affecting Lock Construction on Canalized Rivers Having
Fixed Dams

567-590

Floating Concrete Plant, A Complete

83-88

Fluctuations of Water Level in a Canal Caused by the Filling of
Locks

201-206

Forms at Lock No. 21, Cumberland River, Cost of

601-612

[blocks in formation]

Rebuilding Lock Gates, Milan Section of Illinois and Mississippi

[blocks in formation]

Rock Dredging at Carr Shoals, Oconee River, Georgia
Replacing Lock Gates on the Kanawha River.
Surveys and Borings for Lock Location, Ohio River

509-512

77-80

418-431

509-512

Rock Dredging at Carr Shoals, Oconee River, Georgia_
Searchlights:

Field Searchlights

New Portable Searchlight Tower, A.
Selected Articles of Engineering Interest_-

1-29

336

145-161, 337-351, 517-527, 673-685

Specifications for Electrical Apparatus, Government –
Surveys and Borings for Lock Location, Ohio River

54-74
418-431

Technical Reserve for the Army, Civilian's Suggestions for a 477-508, 648-662
Terminal Facilities in Their Relation to Waterway Improvement_-- 236-248
Totten, Joseph Gilbert

Trade Publications

313-314

143-144

Transportation, Railway, Required for a Pioneer Battalion, U. S. A... 613-617
Wood Preservation, An Experiment in__.

231-235

« AnteriorContinuar »